| Notes |
| Date |
Text |
| 2022-10-22 16:05:42 | [email protected] | | | [email protected] | | | | | | 1. PLEASE SUBMIT FBC/NOA FOR CASEMENT AND ARCH WINDOWS | | | NOTED ON FLOOR PLAN SCOPE OF WORK. | | | 2. PLEASE NOTE HRH FOR DETERMINATION OF REQUIRED DESIGN | | | PRESSURES. | | | 3. PLEASE PROVIDE A FLASHING DETAIL, OR ADD A NOTE TO | | | THE PLAN, DEMONSTRATING COMPLIANCE WITH FBC R 703.4 OR | | | FBC B 1405.4. | | | DIGITAL SIGNATURE- DISAPPROVED | | | 1. IF MRH IS OVER 60', ENGINEERED DESIGN PRESSURES ARE | | | REQUIRED. IF NOT, PLEASE DISREGARD THIS COMMENT AND I | | | WILL RESULT AS N/A. | | | |
|