| Plan Review Notes For Permit 22071181 |
| Permit Number |
22071181 |
|
| Review Stop |
Z |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-10-04 13:57:48 | 0/04/22 FAILED | | | | | | PREVIOUS COMMENT NOT ADDRESSED FULLY, SEE BELOW | | | | | | ALL PARKING AREAS NEED TO BE SETBACK AT LEAST 5 FT FROM | | | THE FRONT PROPERTY LINE. THIS ISNT SHOWN ON SOUTH | | | PROPERTY LINE | | | | | | ADDITIONALLY, CITY CODE STATES THAT THE LESSER OF 75% | | | OR 1000 SQ FEET OF THE FRONT YARD MUST BE LANDSCAPED | | | WITH LIVING PLANT MATERIAL. HOWEVER, IF YOU ARE | | | INTENDING TO USE A PERMEABLE PAVER SYSTEM, 60 PERCENT | | | OF THE FRONT YARD AREA SHALL BE LANDSCAPED WITH LIVING | | | PLANT MATERIAL. THE FRONT YARD IS MEASURED FROM THE | | | FRONT OF THE BUILDING TO THE PROPERTY LINE, AND THE | | | SURVEY SHOWS NEARLY THE ENTIRE FRONT YARD IS GOING TO | | | BE PAVED.I HAVE ILLUSTRATED ON THE SITE PLAN WHERE YOUR | | | FRONT YARD IS. ACCORDING TO COE, IT IT MEASURED FROM | | | THE VERY FRONTMOST POINT OF THE BUILDING. THEREFORE, | | | YOU ARE STILL PROPOSING TO PAVE NEARLY THE ENTIRE FRONT | | | YARD | | | ALEXANDER FOWLKES | | | [email protected] | | | 5618221431 |
|