2022-10-10 16:51:13CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RES = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION
 NFPA 54 = NATIONAL FUEL GAS CODE
 NFPA 96 = STANDARD FOR VENTILATION CONTROL AND FIRE
 PROTECTION OF COMMERCIAL COOKING OPERATIONS 2017
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22070773 320 BELVEDERE RD
  
  
 2ND REVIEW
  
 NOTE: A RESPONSE LETTER ADDRESSING EACH ITEM WAS NOT
 PROVIDED WITH THIS SUBMITTAL.
  
 PROVISO #1: P-2.01/KEYNOTES 20/21: A 3 INCH SANITARY
 DRAIN IS NOTED FOR THE DRY STORAGE ROOM; CONNECTION TO
 EXISTING SANITARY. A PLAN REVISION WILL BE REQUIRED
 SHOWING THE CONNECTION TO EXISTING. REVISION SHALL BE
 SUBMITTED, APPROVED AND IN PLACE AT TIME OF FINAL
 INSPECTION. DRAINS ARE REMOVED FROM DRY STORAGE PER
 ENGINEER; REVISION STILL REQUIRED TO SHOW NO DRAINS.
 SEE P-3.05.
  
 PROVISO #2: MANUFACTURER'S SPECIFICATION/INSTALLATION
 MANUAL FOR THE FOLLOWING SHALL BE ON SITE PRIOR TO
 FINAL INSPECTION:
 ***A) WATER HEATER(S)
 ***B) BACKFLOW PREVENTER DEVICES
 ***C) THERMOSTATIC MIXING VALVES
 ***D) KITCHEN EQUIPMENT
  
 PROVISO #3: RMS 128/129 AND 130/131 ARE RECONFIGURED TO
 ELIMINATE ONE BATHROOM IN EACH CONFIGURATION; REMAINING
 BATHROOMS ARE RECONFIGURED. ROOM 127 BATHROOM IS
 RECONFIGURED. A PLAN REVISION WILL BE REQUIRED SHOWING
 THE REVISED WATER AND SANITARY. REVISION SHALL BE
 SUBMITTED, APPROVED AND IN PLACE AT TIME OF INSPECTION.
  
 PROVISO #4: P-2.01/KEY NOTE 28 AND PD-1.01/ KEY NOTE 4:
 RELOCATED IWHS; PER WPB FBC 107.2.1, PROVIDE THE
 FOLLOWING:
 ***A) A WATER RISER DIAGRAM TO INCLUDE ALL COMPONENTS
 AND SIZING OF THE HOT AND COLD WATER PIPING INTEGRATED
 WITH EXISTING
 ***B) A DETAIL FOR INSTALLATION OF UNITS TO INCLUDE ALL
 DOMESTIC WATER PIPING AND GAS PIPING.
 ***C) A DETAIL FOR STRUCTURAL SUPPORT SYSTEM.
 A PLAN REVISION WILL BE REQUIRED SHOWING THE ABOVE.
 REVISION SHALL BE SUBMITTED, APPROVED AND IN PLACE AT
 TIME OF INSPECTION.
  
  
 PLUMBING COMMENTS: DENIED
  
 1. THE BACKFLOW PERMIT AND INTERCEPTOR PERMITS ARE
 REQUIRED TO BE SUBMITTED PRIOR TO ISSUANCE OF THE
 PRIMARY PERMIT. YOU CAN SUBMIT AN APPLICATION "TBD" (TO
 BE DETERMINED) IF YOU DO NOT HAVE A CONTRACTOR SELECTED
 BY EMAILING A COMPLETED PERMIT APPLICATION TO
 [email protected] . YOU WILL RECEIVE INSTRUCTIONS
 TO PAY FEES AND UPLOAD PLANS. YOU MAY UPLOAD PLANS AND
 PAY FEES AT A FUTURE DATE, BUT THE APPLICATION IS
 REQUIRED AT THIS TIME. WE RECOMMEND THAT YOU PAY FEES
 AND UPLOAD PLANS AT THE SAME TIME. SO THAT APPROPRIATE
 ACTION CAN BE TAKEN BY PLAN REVIEWER, PLEASE ADVISE
 (CONTACT SAMANTHA HILL, CHIEF PLANS EXAMINER,
 [email protected] OR RYAN BROWN, CHIEF PLUMBING INSPECTOR,
 [email protected])WHEN THE APPLICATIONS HAVE BEEN MADE.
 PROVIDE THE PERMIT NUMBERS.
 A SEPARATE PERMIT IS REQUIRED FOR EACH, HOWEVER A
 REVIEW OF THE SYSTEMS UNDER THE MAIN PERMIT IS ALSO
 REQUIRED.
 NOTE: THE CIVIL DRAWINGS SUBMITTED ON 9/29 (C-1.00,
 C-2.00, C-3.00, C-4.00) DO NOT SHOW ANY INDICATION OF A
 GREASE INTERCEPTOR
  
 2. COMPLIED
  
 3. COMPLIED
  
 4. A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS
 REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW
 PROCESS (SEE FBC PL 404.1) BUT IS TYPICALLY ADDRESSED
 ON THE ARCHITECTURAL PLANS. ANY COMMENTS CONCERNING
 THESE REQUIREMENTS MUST BE SATISFACTORILY ADDRESSED
 PRIOR TO A PLUMBING REVIEW APPROVAL.
 PER WPB FBC 107.2.1, TO SHOW COMPLIANCE WITH FBC ACC
 CHAPTERS 2, 3 AND 6 PROVIDE PLAN AND ELEVATION DETAILS
 FOR NEW TOILET ROOM INDICATING THE FOLLOWING:
 ***B) SECOND REQUEST: A.602/ KEYNOTE 3: PLUMBING
 FIXTURE SCHEDULE CALL FOR FLOOR MOUNTED WATER CLOSET.
 PER FBC ACC 604.8.1.1., PROVIDE A 60 INCH BY 59 INCH
 CLEAR FLOOR SPACE FOR THE WATER CLOSET. RECONCILE WITH
 A.601/WATER CLOSET DETAIL. PROVISO: A-602/KEYNOTE 3;
 CLEAR FLOOR SPACE FOR WATER CLOSET SHALL BE 60 INCHES
 BY 59 INCHES
 ***F) SECOND REQUEST: PER FBC ACC 604.8, TOILET PAPER
 DISPENSERS SHALL COMPLY WITH 309.4 AND SHALL BE 7
 INCHES MINIMUM AND 9 INCHES MAXIMUM IN FRONT OF THE
 WATER CLOSET MEASURED TO THE CENTERLINE OF THE
 DISPENSER. THE OUTLET OF THE DISPENSER SHALL BE 15
 INCHES MINIMUM AND 48 INCHES MAXIMUM ABOVE THE FINISH
 FLOOR AND SHALL NOT BE LOCATED BEHIND GRAB BARS.
 ***J) COMPLIED
 ***K) COMPLIED
 ***L) SECOND REQUEST: MIRRORS LOCATED ABOVE LAVATORIES
 OR COUNTERTOPS SHALL BE INSTALLED WITH THE BOTTOM EDGE
 OF THE REFLECTING SURFACE40 INCHES (1015 MM) MAXIMUM
 ABOVE THE FINISH FLOOR OR GROUND. MIRRORS NOT LOCATED
 ABOVE LAVATORIES OR COUNTERTOPS SHALL BE INSTALLED WITH
 THE BOTTOM EDGE OF THE REFLECTING SURFACE 35 INCHES
 (890 MM) MAXIMUM ABOVE THE FINISH FLOOR OR GROUND PER
 FBC ACC 603.3.
 ***M) SECOND REQUEST: PROVIDE ELEVATION DETAIL FOR THE
 DRINKING FOUNTAIN SHOWING COMPLIANCE WITH FBC ACC
 602.2, 602.3, 602.4, 602.5 AND 602.7
 NEW COMMENT: THE DRINKING FOUNTAIN SHALL COMPLY WITH
 FBC ACC 307.2. OBJECTS WITH LEADING EDGES MORE THAN 27
 INCHES AND NOT MORE THAN 80 INCHES ABOVE THE FLOOR
 SHALL NOT PROTRUDE MORE THAN 4 INCHES HORIZONTALLY INTO
 THE CIRCULATION PATH.
  
 5.N/A
  
 6.P-2.01/KEYNOTE 2, A.101B/KEYNOTE 15 AND
 A.101C/KEYNOTE 15, D.101/KEYNOTE 27: ALL NOTE REMOVAL
 OF EXISTING PLUMBING FIXTURES AND REPLACE WITH NEW. RMS
 128/129 AND 130/131 ARE RECONFIGURED TO ELIMINATE ONE
 BATHROOM IN EACH CONFIGURATION.
 PER WPB FBC 107.2.1., PROVIDE THE FOLLOWING:
 ***A) SECOND REQUEST: PER FBC ACC 809.4, PLEASE
 IDENTIFY THE ACCESSIBLE GUEST ROOMS AND PROVIDE
 ELEVATION AND PLAN DETAILS FOR ACCESSIBLE BATHING
 ROOM(S) SHOWING COMPLIANCE WITH FBC ACC 603 THROUGH
 610.
 ***B) COMPLIED
 ***C) COMPLIED
 ***D) RMS 128/129 AND 130/131 ARE RECONFIGURED TO
 ELIMINATE ONE BATHROOM IN EACH CONFIGURATION. SEE
 PROVISO: A PLAN REVISION
 WILL BE REQUIRED SHOWING THE REVISED WATER AND
 SANITARY. REVISION SHALL BE SUBMITTED, APPROVED AND IN
 PLACE AT TIME OF INSPECTION.
  
 7. SECOND REQUEST: P-3.01/KITCHEN: ITEMS 1.1, 1.3 AND
 90, EVAPORATOR COIL DRAINS SHALL NOT DISCHARGE TO THE
 GREASY WASTE (FBC PL 1003.2), OR TO SANITARY (WPB CODE
 OF ORDINANCE CHAPTER 90, ARTICLE 3, SECTION 90-12B5).
 PER WPB FBC 107.2.1, DISCHARGE TO STORM OR TO DRYWELL.
 PROVIDE ROUTING AND A DETAIL.
  
 8. P-3.01/KITCHEN: ITEMS 84, 85, 88 AND FLOOR DRAINS
 NOT RECEIVING GREASY WASTE SHALL NOT DISCHARGE TO THE
 GREASY WASTE (FBC PL 1003.2). DISCHARGE TO SANITARY.
 NEW COMMENT: ITEM 65 HAND SINK SHALL NOT DISCHARGE TO
 THE GREASE (FBC PL 1003.2)
 NEW COMMENT: ITEMS 1.1 AND 1.3 EVAPORATOR COILS SHALL
 NOT DISCHARGE TO THE GREASY WASTE (FBC PL 1003.2) OR TO
 SANITARY (WPB CODE OF ORDINANCE CAPTER (), ARTICLE 3,
 SECTION 90-12B5) DISCHARGE TO STORM OR DRYWELL. PROVIDE
 ROUTING AND A DETAIL.
  
 9. P-3.01/KITCHEN: PER FBC PL 708.1.3, PROVIDE AN
 IN-LINE/TWO-WAY CLEANOUT AT THE JUNCTION OF THE
 BUILDING DRAIN AND BUILDING SEWER. SHOW ON P-2.01 AS
 WELL.
  
 10. SECOND REQUEST: P-3.02/BAR: UNDERCOUNTER
 REFRIGERATION COIL AND BACK BAR COOLER SHALL NOT
 DISCHARGE TO THE GREASY WASTE (FBC PL 1003.2), OR TO
 SANITARY (WPB CODE OF ORDINANCE CHAPTER 90, ARTICLE 3,
 SECTION 90-12B5). PER WPB FBC 107.2.1, DISCHARGE TO
 STORM OR TO DRYWELL. PROVIDE ROUTING AND A DETAIL.
  
 11. SECOND REQUEST: P-3.02/BAR: BAR EQUIPMENT SHALL NOT
 DISCHARGE TO THE GREASY WASTE (FBC PL 1003.2).
 DISCHARGE TO SANITARY.
  
 12. SECOND REQUEST: P-3.02/BAR: PER FBC PL 901.2,
 901.2.1 AND 909.1, PROVIDE A VENT(S) FOR THE SYSTEM.
 COMPLY WITH ONE OR MORE OF THE METHODS LAID OUT IN FBC
 PL CHAPTER 9. TO BE CLEAR, THERE SHALL BE AT LEAST ONE
 VENT TO THE OUTSIDE OF THE BUILDING PER FBC PL 904.1
  
 13. SECOND REQUEST: P-3.02/BAR: PER FBC PL 708.1.3,
 PROVIDE AN IN-LINE/TWO-WAY CLEANOUT AT THE JUNCTION OF
 THE BUILDING DRAIN AND BUILDING SEWER. SHOW ON P-2.01
 AS WELL.
  
 14.THIS COMMENT IS NOT APPLICABLE: P3.03/GRILL: BAR
 EQUIPMENT SHALL NOT DISCHARGE TO THE GREASY WASTE (FBC
 PL 1003.2). DISCHARGE TO SANITARY.
 NEW COMMENT: P3.03/GRILL- HAND SINK SHALL NOT DISCHARGE
 TO THE GREASE (FBC PL 1003.2)
  
 15. SECOND REQUEST: P3.03/GRILL: PROVIDE INDIVIDUAL
 VENT TO THE OUTDOORS PER FBC PL 904.1.
 TO BE CLEAR, THERE SHALL BE AT LEAST ONE VENT TO THE
 OUTSIDE OF THE BUILDING PER FBC PL 904.1
  
 16. SECOND REQUEST: P3.03/GRILL: PER FBC PL 708.1.3,
 PROVIDE AN IN-LINE/TWO-WAY CLEANOUT AT THE JUNCTION OF
 THE BUILDING DRAIN AND BUILDING SEWER. SHOW ON P-2.01
 AS WELL.
  
 17. COMPLIED
  
 18. SECOND REQUEST: P-3.04/WOMEN'S RESTROOM: PER FBC PL
 909.1, PROVIDE A VENT(S) FOR WC-2 WATER CLOSET.
  
 19. SECOND REQUEST: P-3.04/MEN'S RESTROOM: PER FBC PL
 909.1, PROVIDE VENT(S) FOR THE UR URINALS.
  
 20. SECOND REQUEST: P-3.04/MEN'S RESTROOM: PER FBC PL
 909.1, PROVIDE A VENT FOR THE 3 INCH FLOOR DRAIN.
  
 21. P-3.04/COMMON RESTROOMS: PER FBC PL 708.1.3,
 PROVIDE AN IN-LINE/TWO-WAY CLEANOUT AT THE JUNCTION OF
 THE BUILDING DRAIN AND BUILDING SEWER. SHOW ON P-2.01
 AS WELL.
  
 22. P-3.05/DRY STORAGE: PER FBC PL 708.1.3, PROVIDE AN
 IN-LINE/TWO-WAY CLEANOUT AT THE JUNCTION OF THE
 BUILDING DRAIN AND BUILDING SEWER. SHOW ON P-2.01 AS
 WELL.
 NEW COMMENT: IF PLUMBING IS NO LONGER REQUIRED FOR DRY
 STORAGE THEN REMOVE THE PLUMBING PLAN P3.05 OR EDIT IT
 TO REFLECT THE FACT.
  
 23. COMPLIED
 24. SECOND REQUEST: PER WPB FBC 107.2.1, PROVIDE PIPING
 MATERIAL SPEC FOR SANITARY SOIL, WASTE AND VENT PIPING.
 NEW COMMENT: PER WPB FBC 107.2.1, PROVIDE PIPING
 MATERIAL SPEC FOR WATER DISTRIBUTION. FBC PL 605.4
 NEW COMMENT: PER WPB FBC 107.2.1, PROVIDE PIPING
 MATERIAL SPEC FOR HOT WATER PIPE INSULATION. FBC EC
 C404.4 (A-E) AND TABLE C403.2.10
  
 25. SECOND REQUEST: ALL COMPONENTS IN THE DOMESTIC
 WATER SYSTEM SHALL BE LEAD FREE IN ACCORDANCE WITH FBC
 PL 605.2 AND 605.2.1. PER WPB FBC 107.2.1, PROVIDE NOTE
 ON PLANS STATING THE SAME.
  
 26. COMPLIED
  
 27. COMPLIED
  
 28. COMPLIED
 NEW COMMENT: WATER HEATER DETAIL HAS BEEN REMOVED;
 PROVIDE A NEW DETAIL SHOWING THE PIPING ARRANGEMENT FOR
 THE SCHEDULED WATER HEATER, EXPANSION TANK, RELIEF
 VALVE, LEONARD MEGATRON PNV-100-LF DIGITAL TEMPERATURE
 CONTROL STATION WITH MIXING VALVE, RECIRCULATING PUMP
 AND ASSOCIATED VALVES/APPURTENANCES. THE CONTROL
 STATION CAN BE INDICATED BY A TAGGED SQUARE; REFERENCE
 LEONARD SUBMITTAL DATA SHEET S-PNV-100-LF-M JUNE, 2021
 WHICH SHALL BE PART OF YOUR SUBMITTAL FOR DETAIL. SHOW
 PIPING IN AND OUT OF THE STATION. INCLUDE TEMPERATURE
 OF HOT WATER OUT OF STATION. SUBMIT LEONARD SUBMITTAL
 DATA SHEET S-PNV-100-LF-M JUNE, 2021.
  
 29. SECOND REQUEST: P-4.01/WATER HEATER SCHEDULE: EEMAX
 EMT1.0 AND EEMAX EMT2.5 ARE STORAGE TANK TYPE WATER
 HEATERS. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF WATER
 HEATER SHOWING HEATER W/STORAGE CAPACITY, PIPING
 INCLUDING CW, HW, VALVES, THERMAL EXPANSION CONTROL
 DEVICE (INCLUDING SIZE), T&P DISCHARGE (INCLUDING
 TERMINATION) AND WATER HEATER PAN AND DRAIN INCLUDING
 TERMINATION IF IN A LOCATION THAT CAN CAUSE WATER
 DAMAGE; COMPLY WITH FBC PL 607.3, 503.1, 504.1, 504.4,
 504.4.1, 504.5, 504.6, 504.7, 504.7.1 AND 504.7.2.
 PROVIDE TEMPERATURE OF HOT WATER AT OUTLET.
  
 30.COMPLIED
  
 31. COMPLIED
  
 32. P-3.05/DRY STORAGE: PER FBC PL 1002.4.1, PLEASE
 PROVIDE A TRAP SEAL PROTECTION DEVICE FOR THE FLOOR
 TROUGH.
 NEW COMMENT: IF PLUMBING IS NO LONGER REQUIRED FOR DRY
 STORAGE THEN REMOVE THE PLUMBING PLAN P3.05 OR EDIT IT
 TO REFLECT THE FACT.
  
 33. P-3.05/DRY STORAGE: PER WPB FBC 107.2.1, PLEASE
 PROVIDE A SCHEDULE AND SPECIFICATION FOR FLOOR DRAINS,
 FLOOR SINKS AND TROUGH DRAINS.
 NEW COMMENT: IF PLUMBING IS NO LONGER REQUIRED FOR DRY
 STORAGE THEN REMOVE THE PLUMBING PLAN P3.05 OR EDIT IT
 TO REFLECT THE FACT.
  
 34.P-3.05 & P-4.02/DETAIL 4: PER WPB FBC 107.2.1, SHOW
 THE INSTALLATION OF THE BACKFLOW PREVENTER(S) AND
 BACKFLOW PREVENTER SPECIFICATION. THE BACKFLOW
 PREVENTER IN P-3.05 IS NOT IN-LINE. CLARIFY AND
 RECONCILE THE DRAWINGS.
 NEW COMMENT: IF PLUMBING IS NO LONGER REQUIRED FOR DRY
 STORAGE THEN REMOVE THE PLUMBING PLAN P3.05 OR EDIT IT
 TO REFLECT THE FACT. IF P-4.02/DETAIL 4 IS NO LONGER
 REQUIRED THEN PLEASE REMOVE IT. OTHERWISE, SPECIFY AND
 PROVIDE A BACKFLOW PREVENTER ON THE OUTLET TO THE
 ICEMAKER. FBC PL 608.1
  
 35.SECOND REQUEST: PER WPB FBC 107.2.1, PROVIDE A SLAB
 REPAIR DETAIL ON THE PLANS. SHOW THE WIDTH OF THE
 REPAIR, THE MINIMUM THICKNESS AND PSI OF THE CONCRETE
 TO BE REPLACED. SHOW SIZE, LENGTH, SPACING (ON CENTER),
 MINIMUM EMBEDMENT AND ANCHORING/ADHESIVE MATERIAL FOR
 DOWELS. THE REPAIR SHALL ALSO INCLUDE TERMITE TREATMENT
 OF THE SOIL AS WELL AS THE REQUIRED VAPOR BARRIER OVER
 WELL COMPACTED SOIL. A COPY OF THE TERMITE CERTIFICATE
 SHALL BE ONSITE FOR FINAL INSPECTION.
  
 36. SECOND REQUEST: PER WPB FBC 107.2.1, TO SHOW
 COMPLIANCE WITH FBC PL 704.1, PROVIDE NOTE STATING
 "HORIZONTAL DRAINAGE PIPING LESS THAN 3 INCH DIAMETER
 SHALL HAVE A MINIMUM SLOPE OF 1/4 INCH PER FOOT. 3 INCH
 TO 6 INCH DIAMETER SHALL HAVE A MINIMUM SLOPE OF 1/8
 INCH PER FOOT."
  
 37. SEE PROVISO #4
  
  
 END OF COMMENTS.
  
 PLEASE PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM
 WHEN RESUBMITTING.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved