| Date |
Text |
| 2022-07-27 12:25:51 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1. PLEASE PROVIDE ENGINEER'S SIGNED AND |
| | SEALED FASTENER SPACING DETAIL WITH CALCULATIONS FOR |
| | PERIMETERS AND CORNERS AS PER PRODUCT APPROVAL |
| | LIMITATIONS #7 OF MIAMI-DADE NOA NO.: 20-0902.19. |
| | PLEASE NOTE THIS PROJECT IS LOCATED IN AN EXPOSURE C |
| | CATEGORY AREA. SECOND REQUEST. |
| | 2. FBC R 301 FAC9N-3 SUBMITTED MIAMI-DADE COUNTY NOA |
| | 21-0602.14 SELECT INSTALLATION PROCEDURE SYSTEM TYPE |
| | E(1), E(2) OR E(3) IT DO NOT ALLOW FOR DIRECT-TO-DECK |
| | INSTALLATION. THE CITY OF WEST PALM BEACH WILL NOT |
| | ACCEPT DIRECT-TO-DECK METHOD OF INSTALLATION FOR THIS |
| | NOA. |
| | 3. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA NO. |
| | 21-0107.02 HAS EXPIRED AND IS NO LONGER VALID. PROVIDE |
| | A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED ROOFING TILE |
| | SYSTEM TO BE USED. ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| | APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| | SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| | SITE-SPECIFIC ENGINEERING. |
| | 4. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE TILE ADHESIVE TO BE USED. SECOND REQUEST. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |