| Date |
Text |
| 2022-07-21 08:42:39 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA |
| | 16-0314.08 HAS EXPIRED AND IS NO LONGER VALID. PLEASE |
| | PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA?S FOR THE PROPOSED ROOFING TILE SYSTEM TO |
| | BE USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND |
| | INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| | APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| | 2. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA NO. |
| | 20-0131.02 IS NOT APPROVED FOR USE AS A SEAM TAPE. |
| | MIAMI-DADE COUNTY NOA NO. 19-0109.08 DO NOT PROVIDE FOR |
| | USE OF SEAM TAPE IN THE APPROVED ASSEMBLIES. IF |
| | APPLICABLE PROVIDE A 2020 CODE VERSION PRODUCT |
| | APPROVAL/NOA THAT INCLUDES USE OF SEAM TAPE IN AN |
| | APPROVED ASSEMBLY. ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| | APPROVAL DRAWINGS. |
| | 3. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE METAL TO BE USED. (FL5374-R6) |
| | 4. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE TILE ADHESIVE TO BE USED. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |