| Date |
Text |
| 2022-08-18 16:02:19 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE VALUE SPECIFIED ON THE APPLICATION OF $2500.00 |
| | IS TOO LOW FOR THE SCOPE OF WORK SHOWN ON THE DRAWINGS. |
| | BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES, |
| | VALUATION OF FBC 109.3 BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 2) SPECIFY THE BUILDING DATA ON THE PLANS. CONSTRUCTION |
| | TYPE, OCCUPANCY TYPE, SPRINKLERED OR UN-SPRINKLERED, |
| | OCCUPANT LOAD, NUMBER OF STORIES AND SQUARE FOOT AREA. |
| | FBC AMENDMENTS 107.2.1 |
| | |
| | 3) SPECIFY THE LEVEL OF ALTERATION FOR THE WORK PER FBC |
| | EXISTING BUILDING SECTION 601. |
| | |
| | 4) IT APPEARS THAT THERE WILL BE RAMPS TO THE ELEVATED |
| | AREAS. HOWEVER, NO DETAILS HAVE BEEN PROVIDED FOR THE |
| | RAMPS. SHOW COMPLIANCE WITH FBC ACCESSIBILITY SECTION |
| | 201.1.1. |
| | |
| | 5) PROVIDE DETAILS FOR EACH OF THE PROPOSED RAMPS TO |
| | SHOW COMPLIANCE WITH FBC ACCESSIBILITY SECTION 405. |
| | |
| | 6) PROVIDE DETAILS FOR THE STAIRS AT THESE PROPOSED |
| | ELEVATED AREAS. FBC ACCESSIBILITY SECTION 504 |
| | |
| | 7) SUBMIT STRUCTURAL DRAWINGS FOR THE ELEVATED STAGE, |
| | DJ BOOTH AND VIP AREAS. SPECIFY THE FLOOR LIVE LOADS |
| | FOR THESE AREAS. FBC AMENDMENTS 107.2.1 AND FBC |
| | 1603.1.1 |
| | |
| | 8) A THOROUGH AND COMPLETE PLAN REVIEW CANNOT BE |
| | COMPLETED AT THIS TIME DUE TO LACK OF INFORMATION ON |
| | THE SUBMITTED PLANS. ADDITIONAL PLAN REVIEW COMMENTS |
| | MAY BE GENERATED WHEN MORE INFORMATION IS PROVIDED. |
| | PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH OF |
| | THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |