| Date |
Text |
| 2022-12-06 10:49:59 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | TEST REPORTS WERE NOT SUBMITTED. NOT CLEAR HOW ITEM #3 |
| | WAS ADDRESSED. |
| | |
| | 1. OK |
| | |
| | 2. FS471, ENGINEER DOES NOT HAVE A DIGITAL OR |
| | ELECTRONIC SIGNATURE - HE CAN SUBMIT ONE SIGNED AND |
| | SEALED PAPER ORIGINAL AFTER ALL REVIEWS HAVE PASSED. |
| | |
| | 3. FBC B 1207 (ALSO SEE PREVIOUS LIST FOR MORE COMPLETE |
| | CODE REFERENCES AND GUIDANCE). BASED ON THE FILES |
| | UPLOADED, NUCORE FLOORING IS PROPOSED OVER SHAW |
| | GROUNDWORKS UNDERLAYMENT. |
| | |
| | FLAME SPREAD FOR GROUNDWORKS - IS OK. |
| | |
| | THE STC/IIC FOR GROUNDWORKS WAS DONE WITH SMARTCORE PRO |
| | FLOORING. SINCE LVT HAS A STC/IIC VALUE, IT IS NOT |
| | CLEAR IF THE FLOORING PROPOSED COMPLIES WITH THE |
| | MINIMUM REQUIREMENTS OF STC/IIC. EITHER PROVIDE AN |
| | ENGINEERED ANALYSIS OF NUCORE VS. SMARTCORE, OR PROVIDE |
| | TEST REPORTS FOR STC/IIC FOR THIS ASSEMBLY, OR PROPOSE |
| | A DIFFERENT PRODUCT. |
| | |
| | YOU MAY EMAIL THE PROPOSED RESOLUTION PRIOR TO |
| | RESUBMITTING IF YOU WOULD LIKE. ALTHOUGH THIS REVIEW IS |
| | BEING DONE WITHIN A DAY OF RESUBMITTAL, THIS IS NOT |
| | TYPICAL. OUR TARGET IS 10-14 DAYS. |
| | |
| | |
| | |
| | FOR REFERENCE ONLY, THE FOLLOWING FILES WERE SUBMITTED |
| | FOR FLOORING: |
| | |
| | SHAW GROUNDWORKS UNDERLAYMENT FLAME SPREAD (FILE NAME |
| | INTERTEK FLAME SPREAD TEST REPORT) |
| | NUCORE FLOORING SPEC SHEET |
| | SMARTCORE PRO STC/IIC (FILE NAME SHAW INDUSTRIES VINYL |
| | PLANK TEST REPORT) |
| | |
| | |
| | |
| | |