| Date |
Text |
| 2022-07-05 09:23:43 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1. SUBMITTED FLORIDA DBPR PRODUCT |
| | APPROVAL FL28328 IS THE 2017 CODE VERSION AND IS NO |
| | LONGER VALID. PLEASE PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA?S FOR THE PROPOSED |
| | CONCRETE ROOF TILE SYSTEM TO BE USED. INCLUDE COVER |
| | PAGE, EVALUATION REPORTS AND INSTALLATION INSTRUCTIONS |
| | FOR SYSTEM USED. |
| | 2. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| | APPROVAL FL1654-R29 SYSTEM NO. W-111 DOES NOT MEET THE |
| | MINIMUM ZONE 3 DESIGN PRESSURE REQUIREMENT OF -108.17 |
| | FOR EXPOSURE CATEGORY C AREAS. PROVIDE SYSTEM THAT |
| | MEETS OR EXCEEDS ALL DESIGN PRESSURE REQUIREMENTS FOR |
| | EXPOSURE CATEGORY C/PROVIDE SIGNED AND SEALED |
| | ENGINEERED NAILING CALCULATIONS WITH AN APPROVED |
| | SYSTEM. |
| | 3. FBC B 107.2.1. CITY OF WEST PALM BEACH IS NOT |
| | LOCATED IN A HVHZ AND HAS NOT ADOPTED RAS 119. PLEASE |
| | PROVIDE PAGE #14 HIP & RIDGE INSTALLATION OF THE |
| | FLORIDA HIGH WIND CONCRETE AND CLAY TILE INSTALLATION |
| | MANUEL 6TH EDITION. PLEASE INDICATE (HIGHLIGHT/CIRCLE) |
| | THE FOLLOWING: FIELD TILE ATTACHMENT; STRUCTURAL |
| | SUPPORT; MEMBER ATTACHMENT; TRIM TILE ATTACHMENT; |
| | WEATHER BLOCKING & FINISH. ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |