| Plan Review Notes For Permit 22061065 |
| Permit Number |
22061065 |
|
| Review Stop |
Z |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2023-02-03 16:35:30 | PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR | | | THE CAR WASH BUILDING THE PROPERTY OWNER MUST: | | | | | | A. RECORD A PUBLIC ACCESS EASEMENT, ACCEPTABLE TO THE | | | CITY ATTORNEY'S OFFICE, FOR THE PLAZA ALONG WEST | | | EXECUTIVE CENTER DRIVE. THE EASEMENT MAY OCCUR ON THE | | | PLAT. | | | B. GRANT THE REDEDICATED DRAINAGE EASEMENT TO THE CITY | | | FOR THE EXISTING DRAINAGE PIPE ALONG THE SOUTH PROPERTY | | | LINE. | | | C. PLAT THE PROPETY. | | | | | | SEPARATE PERMITS, WITH PLANS ARE REQUIRED FOR: | | | | | | A. DUMPSTER ENCLOSURE. | | | B. VACUUM ENCLOSURES AND VACUUM EQUIPMENT. | | | C. FLAG POLE, BOLLARDS, BICYCLE RACKS, BENCHES AND | | | OTHER ABOVE GROUND FIXTURES. | | | D. SITE LIGHTING - THE SITE LIGHTING PERMIT SHALL | | | INCLUDE THE LIGHT POLE SPECIFICATIONS, INCLUDING POLE | | | AND FIXTURE HEIGHTS, TO ENSURE NO CONFLICTS WITH THE | | | PROPOSED GUMBO LIMBO TREE CANOPIES. | | | E. LANDSCAPE. | | | F. IRRIGATION. | | | G. HARDSCAPE. | | | H. PARKING LOT STRIPING. | | | I. SIGNAGE. | | | J. PAY STATION. | | | |
|