| Date |
Text |
| 2022-07-28 09:20:10 | PLAN REVIEW COMMENTS |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) SUBMIT THE COMPLETE PRODUCT APPROVALS AND/OR |
| | EVALUATION REPORTS FOR THE FLOOD VENT MODEL 1540-530 |
| | AND TRIM AND SLEEVE KIT 1540-531-12. |
| | |
| | 2) SUBMIT A SIGNED AND SEALED FINAL SURVEY. NOTE: THE |
| | BOOK AND PAGE NUMBER IN SECTION A3 OF THE ELEVATION |
| | CERTIFICATE DID NOT MATCH THE ONE ON THE PREVIOUS |
| | SURVEY DRAWINGS THAT WERE SUBMITTED. OUR RECORDS SHOW |
| | THAT THE PLATS ARE RECORDED IN BOOK 130, PAGE 178. |
| | PLEASE CORRECT. FBC 107.2.1 |
| | |
| | 3) THE BUILDING DIAGRAM NUMBER IN SECTION A7 OF THE |
| | ELEVATION CERTIFICATE SHOULD BE 1A FOR THE GARAGES. |
| | THEY ARE NOT RAISED SLAB ON GRADE PER NFIP ELEVATION |
| | CERTIFICATE INSTRUCTIONS PAGE 7 OF 9. |
| | |
| | 4) THE INFORMATION THAT IS ENTERED IN SECTION A9 OF THE |
| | ELEVATION CERTIFICATE SHOULD BE ENTERED IN SECTION A8. |
| | THIS IS A DETACHED GARAGE AND SECTION A9 IS FOR GARAGES |
| | THAT ARE ATTACHED TO ANOTHER BUILDING. IN SECTION A4 IT |
| | SHOULD BE NOTED THAT THIS IS A DETACHED GARAGE. |
| | |
| | 5) VERIFY THAT THE SQUARE FOOTAGE OF THE GARAGE IS THE |
| | MEASUREMENTS TO THE OUTSIDE WALLS AND THAT THEY |
| | CORRESPOND TO THE SURVEY. NFIP ELEVATION CERTIFICATE |
| | INSTRUCTIONS ITEM A8.A. |
| | |
| | 6) THE TOP OF BOTTOM FLOOR ENTERED IN SECTION C2. A) IS |
| | 15.02 FEET. MAKE SURE THAT THE ELEVATION ON THE FINAL |
| | SURVEY MATCHES THE ELEVATION CERTIFICATE. PLEASE VERIFY |
| | AND MAKE NECESSARY CORRECTIONS. FBC 107.2.1 |
| | |
| | 7) SUBMIT PHOTOGRAPHS OF THE EXTERIOR SIDES OF THE |
| | GARAGE THAT SHOWS THE FLOOD VENTS. FBC 107.2.1 |