| 2022-07-26 06:55:04 | BUILDING REVIEW AUDIT. |
| | STATUS: FAILED |
| | |
| | 1) SEVERAL OF THE STAIR NOTES ON SHEET A5.1 ARE |
| | INCORRECT. |
| | -FBC 311.7.8.1 REQUIRES THE HAND RAIL HEIGHT TO BE NOT |
| | LESS THAN 34 INCHES NOR MORE THAN 38 INCHES. |
| | - FBC-R311.7.5.3 REQUIRES NOSING PROJECTIONS TO BE NOT |
| | LESS THAN 3/4 INCH NOR MORE THAN 1-1/4 INCHES. |
| | - THE FOOT SYMBOL (') IS INCORRECTLY USED IN SEVERAL |
| | PLACES WHERE THE INCH SYMBOL (") SHOULD BE USED. |
| | - NOTE: THE FLORIDA ACCESSIBILITY CODE DOES NOT APPLY |
| | TO THE STAIR HANDRAILS IN SINGLE FAMILY RESIDENCES. |
| | |
| | 2) CITY AMENDMENTS FBC 107.3.4 SUBMIT PRODUCT APPROVALS |
| | FOR THE EXTERIOR DOORS, WINDOWS AND ROOFING MATERIALS |
| | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD. IF YOU WOULD LIKE TO SUBMIT THESE |
| | ITEMS AT A LATER DATE THEN YOU WILL NEED TO COMPLY WITH |
| | THE FOLLOWING: FBC AMENDMENTS 107.3.4.1 DEFERRED |
| | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |
| | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE ISOKERN FIREPLACE, |
| | THE KEMPER BALCONY WATERPROOFING AND THE ELEVATOR. FBC |
| | 107.2.1 IF DEFERRED COMPLY WITH FBC AMENDMENTS |
| | 107.3.4.1. |
| | |
| | 4) SUBMIT TRUSS DRAWINGS AND LAYOUT PLAN. THE TRUSS |
| | LAYOUT PLAN NEEDS TO BE REVIEWED BY THE DESIGNER OF |
| | RECORD FOR COMPLIANCE WITH THEIR DESIGN. FBC 107.2.1 IF |
| | DEFERRED COMPLY WITH FBC AMENDMENTS 107.3.4.1. |
| | |
| | |
| | |