2022-08-29 14:43:362ND REVIEW FBC-2020 PLUMBING
 PERMIT- 22051468
 8/29//2022
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. FAILED COMMENTS FROM THE
 1ST REVIEW ARE LISTED BELOW WITH ADDITIONAL NOTES.
 BASED ON THE NARRATIVE RESPONSE TO COMMENTS IT APPEARS
 THAT SOME OF THE CORRECTED PLANS WERE NOT UPLOADED.
  
 1) FAILED. A-1.0: PROVIDE THE CLEAR FLOOR SPACE
 DIMENSIONS FOR THE ACCESSIBLE WATER CLOSET AND LAVATORY
 SINK- SECS. 604.3 & 606.2 FBC ACCO
 REQUESTED CLEAR FLOOR SPACE DIMENSIONS NOT PROVIDED
  
 2) FAILED. A-7.0: SHOW THE HEIGHT OF THE WATER CLOSET
 MEASURED FROM THE FINISHED FLOOR TO THE TOP OF THE
 SEAT- SEC. 604.4 FBC ACC.
 NOT PROVIDED. THE DETAIL 4 SHOWS THE HEIGHT DIMENSION
 MESURED TO THE RIM OF THE WATER CLOSET AND NOT THE SEAT
 AS REQUIRED.
  
 3) FAILED. A-7.0: SHOW THE HEIGHT OF THE GRAB BARS
 MEASURED FROM THE FINISHED FLOORS TO THE TOPS OF THE
 GRIPPING SURFACES- SEC. 609.4 FBC ACC.
 NOT PROVIDED. THE DETAIL 4 SHOWS THE HEIGHT DIMENSION
 MEASURED TO THE CENTER OF THE GRAB BARS AND NOT THE
 TOPS AS REQUIRED.
  
  
 4) FAILED. A-7.0: SHOW THE LOCATION OF THE TOILET PAPER
 DISPENSER MEASURED FROM THE FRONT OF THE WATER CLOSET
 TO THE CENTERLINE OF THE DISPENSER- SEC. 604.7 FBC ACC.
 THE DETAIL 4 SHOWS THE DIMENSION TO THE SIDE EDGE OF
 THE DISPENSER AND NOT THE CENTER AS REQUIRED.
  
 5) FAILED. P-1.0: THE DISCHARGES FROM THE HAND SINK,
 ICE MAKER, AND ICE BIN SHALL NOT DRAIN INTO THE GREASE
 INTERCEPTOR- SEC. 1003.3.1 FBC P.
 THE CORRECTIONS WERE NOT MADE TO THE PLAN.
  
 7) FAILED. P1.0: PROVIDE CLEANOUTS AT THE JUNCTIONS OF
 THE 2 AND 3-INCH SANITARY BUILDING DRAINS AND THE
 4-INCH SEWER LINE- SEC. 708.1.3 FBC P.
 THE CORRECTIONS WERE NOT MADE TO THE PLAN.
 10) FAILED. P-2.0 THE 1-INCH HOT WATER SUPPLY LINE TO
 THE LAVATORY IS EXCEEDING THE MAXIMUM .5 FT. DISTANCE
 FROM THE HOT WATER SOURCE- TABLE C404.5.1 FBC EC.
 THE CORRECTION WAS NOT MADE TO THE PLAN.
  
 14) FAILED. A- 4: PROVIDE ROOF DRAINAGE PLANS AND
 CALCULATIONS- SECS. 1101.2, 1101.7, 1105.1, 1106.1, &
 1108.1 FBC P.
 CALCULATIONS BASED ON RAINFALL RATE NOT PROVIDED. AREA
 AND GPM FLOW CALCULATIONS NOT PROVIDED.
 A) PROVIDE DOWNSPOUT SIZES. NOT PROVIDED
 C) PROVIDE AN OVERFLOW SCUPPER DETAIL. NOT PROVIDED.
 D) SHOW THE DRAINAGE FROM THE DOWNSPOUTS WILL DISCHARGE
 A MINIMUM OF 12-INCHES FROM THE BUILDING AND WILL BE
 CONVEYED TO AN APPROVED PLACE OF DISPOSAL.
  
 15) P-5.0: CORRECT THE 3-COMPARTMENT SINK DETAIL TO
 SHOW EACH WELL OF THE FIXTURE DRAINING INDIVIDUALLY
 INTO THE FLOOR SINK- SEC. 802.1.1 FBC P
  
 THE DETAIL SHOWS ONE OF THE THREE DRAINS DISCHARGING TO
 THE FLOOR SINK AND NOT TO THE GREASE INTERCEPTOR.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved