| Date |
Text |
| 2023-06-26 19:09:27 | RESIDENTIAL (R3) ALTERATION, FIFTH BUILDING REVIEW |
| | COMMENTS |
| | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. |
| | PERMIT #22051247 |
| | 522 28TH ST |
| | |
| | 3- OK. WINDOW AND DOOR HURRICANE SHUTTERS UNDER PERMIT |
| | #23040271. |
| | |
| | |
| | PREVIOUS COMMENT: |
| | 6.A.) FBC R 806.5 (UNVENTED ATTIC AND ENCLOSED RAFTER |
| | SPACES) PLAN SHEET S1.0 DETAIL F-2 THE ROOF INSULATION |
| | (R-30 PAPER BACK) DOES NOT APPEAR WITHIN ACCORDANCE OF |
| | THIS CODE SECTION. PLEASE CLARIFY BY CHANGING THE |
| | PRODUCT TO A FOAM SPRAY AND SHOWING HOW THE FOAM SPRAY |
| | WILL BE APPLIED IF THAT IS THE INTENTION. |
| | PREVIOUS RESPONSE: REPEAT COMMENT. NOT ADDRESSED. |
| | CONTRACTOR'S RESPONSE LETTER STATES "SEE REVISED SHEET |
| | S1.0.". SHEET S1.0 WAS NOT REVISED. SAME SPECIFICATIONS |
| | ARE SHOWN. SINCE THE ATTIC IS NOT VENTED, IT LOOKS LIKE |
| | FOAM INSULATION WILL BE REQUIRED. REVISE INFORMATION ON |
| | SHEET S1.0. SPECIFY FOAM INSULATION AND R-VALUE. |
| | ALSO, NEED TO PROVIDE ICC EVALUATION REPORT (OR ANY |
| | OTHER APPROVED ENTITY) OF FOAM INSULATION TO SHOW |
| | COMPLIANCE WITH SEC. R316 FBC-RESIDENTIAL. |
| | (NOTE: COORDINATE R-VALUE WITH ENERGY CALCULATIONS TO |
| | AVOID CONFLICTS/DELAYS). |
| | |
| | NEW RESPONSE: |
| | DETAIL F.2 ON SHEET S1.0 WAS REVISED SHOWING R-20 |
| | ICYNENE SPRAY FOAM INSULATION BUT THE ENERGY |
| | CALCULATIONS WERE NOT REVISED: |
| | A) REVISE CEILING INSULATION R-VALUE TO MATCH REVISED |
| | PLANS. |
| | SECTION R101.5.1.1.2 FBC-RESIDENTIAL. |
| | |
| | B)REVISE CONCRETE BLOCK INSULATION R-VALUE TO MATCH |
| | REVISED PLANS. |
| | SECTION R101.5.1.1.2 FBC-RESIDENTIAL. |
| | |
| | C) REVISE ITEM #1 ON PAGE ONE OF ENERGY CALCULATIONS. |
| | THIS IS NOT AN ADDITION. THIS IS AN ALTERATION TO |
| | EXISTING BUILDING (GARAGE). |
| | SECTION R101.5.1.1.2 FBC-RESIDENTIAL. |
| | |
| | D)ICYNENE EVALUATION REPORT ESR-1826 SUBMITTED IS |
| | EXPIRED. IT HAD TO BE RENEWED ON 02/2018. SEE RIGHT TOP |
| | CORNER BELOW ESR-1826. PROVIDE CURRENT EVALUATION |
| | REPORT. |
| | SEC. SECTION R101.5.1.1.2 FBC-RESIDENTIAL. SEC. 107.2.1 |
| | CITY AMENDMENTS. |
| | |
| | NEW COMMENTS BASED ON NEW INFORMATION SUBMITTED. |
| | 7- DRAWING D1.0 SHOWS A NEW DECORATIVE GATE ELEVATION. |
| | NEED TO PROVIDE THE FOLLOWING FOR REVIEW: |
| | A)PROVIDE COMPLETE SIGNED AND SEALED SITE SPECIFIC |
| | ENGINEERING FOR THE CONSTRUCTION AND INSTALLATION OF |
| | THIS DOOR. |
| | NOTE: DESIGN PROFESSIONAL TO TAKE INTO CONSIDERATION |
| | THE INSTALLATION OF HURRICANE STORM PANELS (SEE |
| | SEPARATE PERMIT) TO AVOID CONFLICTS/DELAYS. |
| | FAC 61G20.3001. SEC. R301.2.1 FBC-RESIDENTIAL. SEC. |
| | 107.2.1.2 CITY AMENDMENTS. |
| | |
| | B) SHOW LOCATION OF THE PROPOSED DOOR. |
| | SEC. 107.2.1 CITY AMENDMENTS. |
| | |
| | 8- UPDATE VALUATION TO INCLUDE THE ADDTIONAL DOOR . |
| | INCLUDE THE LABOR AND MATERIALS AND ENGINEERING. SEC. |
| | 109.3 CITY AMENDMENTS. |
| | |
| | 9- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR |
| | MASONRY WALL FLASHING AT ALL NEW EXTERIOR OPENINGS. |
| | SEC. R703.4 FBC-RESIDENTIAL. |
| | SHOW LOCATION OF PROPOSED DOOR. |
| | SEC. 107.2.1 CITY AMENDMENTS. |
| | |
| | 10- PROVIDE EXTERIOR DOOR AND WINDOW STRUCTURAL BUCK |
| | DETAIL SHOWING COMPLIANCE WITH SEC. R609.7.2.1 |
| | FBC-RESIDENTIAL. SPECIFY STRUCTURAL BUCK SIZE AND |
| | FASTENING. |
| | NOTE: STRUCTURAL BUCK NEEDS TO PROVIDE FULL SUPPORT TO |
| | THE DOOR FRAME AS REQUIRED BY SEC. R609.7.2.1 |
| | FBC-RESIDENTIAL. |
| | |
| | 11- DOOR AND WINDOW WIND PRESSURES SPECIFIED UNDER WIND |
| | PRESSURE LOAD ON SHEET D1.0 ARE TOO LOW FOR EXPOSURE C. |
| | REVISE AS REQUIRED. |
| | SEC. R301.2.1 FBC-RESIDENTIAL. |
| | NOTE: WINDOW IS LOCATED IN END ZONE #5 NOT #4. SEE NOTE |
| | "A" ON FIGURE R301.2(7) FBC-RESIDENTIAL. |
| | |
| | 12- 67-1/2" WIDE DOUBLE FRENCH DOOR WILL BE INSPECTED |
| | ON SITE TO VERIFY 32" CLEAR OPENING OF AT LEAST ONE |
| | LEAF. VERIFY SIZE WITH MANUFACTURER TO AVOID DOOR |
| | REPLACEMENT. ALSO. REVISE SIZE OF MASONRY OPENING |
| | SPECIFIED ON THE STRUCTURAL DRAWING. |
| | SEC. 107.2.1 CITY AMENDMENTS |
| | |
| | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE |
| | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND |
| | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE |
| | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| | QUESTIONS REGARDING THESE COMMENTS, |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |