| Date |
Text |
| 2023-03-15 17:17:20 | RESIDENTIAL (R3) ALTERATION, FOURTH BUILDING REVIEW |
| | COMMENTS |
| | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. |
| | PERMIT #22051247 |
| | 522 28TH ST |
| | |
| | |
| | PREVIOUS COMMENT: |
| | 3.) FBC B 107.2.1, THE EXTERIOR WINDOW/DOOR ARE |
| | INDICATED AS NON-IMPACT WINDOWS/DOORS. PLEASE PROVIDE A |
| | CLARIFICATION AS TO THE METHOD OF IMPACT PROTECTION. |
| | |
| | RESPONSE: |
| | CONTRACTOR'S RESPONSE LETTER STATES "THERE WILL BE A |
| | SEPARATE PERMIT PULLED BY THE COMPANY THAT'LL BE |
| | INSTALLING HURRICANE SHUTTERS". PERMIT APPLICATION FOR |
| | SHUTTERS HAS NOT BEEN SUBMITTED YET. THIS ITEM WILL BE |
| | APPROVED WHEN CONTRACTOR APPLIES FOR SHUTTERS PERMIT |
| | AND PROVIDES COMPLETE INFORMATION FOR REVIEW. |
| | |
| | |
| | PREVIOUS COMMENT: |
| | 6.A.) FBC R 806.5 (UNVENTED ATTIC AND ENCLOSED RAFTER |
| | SPACES) PLAN SHEET S1.0 DETAIL F-2 THE ROOF INSULATION |
| | (R-30 PAPER BACK) DOES NOT APPEAR WITHIN ACCORDANCE OF |
| | THIS CODE SECTION. PLEASE CLARIFY BY CHANGING THE |
| | PRODUCT TO A FOAM SPRAY AND SHOWING HOW THE FOAM SPRAY |
| | WILL BE APPLIED IF THAT IS THE INTENTION. |
| | |
| | RESPONSE: |
| | REPEAT COMMENT. NOT ADDRESSED. CONTRACTOR'S RESPONSE |
| | LETTER STATES "SEE REVISED SHEET S1.0.". SHEET S1.0 WAS |
| | NOT REVISED. SAME SPECIFICATIONS ARE SHOWN. SINCE THE |
| | ATTIC IS NOT VENTED, IT LOOKS LIKE FOAM INSULATION WILL |
| | BE REQUIRED. REVISE INFORMATION ON SHEET S1.0. SPECIFY |
| | FOAM INSULATION AND R-VALUE. |
| | ALSO, NEED TO PROVIDE ICC EVALUATION REPORT (OR ANY |
| | OTHER APPROVED ENTITY) OF FOAM INSULATION TO SHOW |
| | COMPLIANCE WITH SEC. R316 FBC-RESIDENTIAL. |
| | (NOTE: COORDINATE R-VALUE WITH ENERGY CALCULATIONS TO |
| | AVOID CONFLICTS/DELAYS). |
| | |
| | |
| | |
| | 10- DESIGNER OF RECORD NEEDS TO PROVIDE NAME AND |
| | SIGNATURE IN ALL DRAWINGS AS REQUIRED BY SEC. 107.2.1 |
| | CITY AMENDMENTS. |
| | |
| | |
| | |
| | NOTE TO CONTRACTOR: |
| | 67-1/2" WIDE DOUBLE FRENCH DOOR WILL BE INSPECTED ON |
| | SITE TO VERIFY 32" CLEAR OPENING OF AT LEAST ONE LEAF. |
| | VERIFY SIZE WITH MANUFACTURER TO AVOID DOOR |
| | REPLACEMENT. ALSO. REVISE SIZE OF MASONRY OPENING |
| | SPECIFIED ON THE STRUCTURAL DRAWING. |
| | |
| | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE |
| | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND |
| | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE |
| | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| | QUESTIONS REGARDING THESE COMMENTS, |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |