| 2023-02-03 15:49:28 | PASSED W/PROVISOS |
| | |
| | 1) ADDITIONAL PERMITS, WITH PLANS ARE REQUIRED FOR THE |
| | FOLLOWING: |
| | |
| | A. LANDSCAPE |
| | B. IRRIGATION |
| | C. EXTERIOR BICYCLE RACKS |
| | D. HARDSCAPE |
| | E. SITE/LANDSCAPE LIGHTING - THE PERMIT NEEDS TO |
| | INCLUDE A PHOTOMETRIC PLAN, AS WELL AS THE SPEC SHEETS |
| | FOR ALL OF THE LIGHTING TYPES. |
| | F. AWNINGS NOT INCLUDED WITH THIS PERMIT |
| | G. MODIFICATIONS TO THE GARAGE, INCLUDING THE EV |
| | CHARGERS. |
| | H. REQUIRED ROOFTOP SOLAR. |
| | |
| | 2) PRIOR TO 1ST C.O.: |
| | |
| | A. PROVIDE VERIFICATION THAT NO LESS THAN 15% OF ALL |
| | CONSTRUCTION SERVICES |
| | ARE FROM SMALL BUSINESS ENTERPRISE (SBE) FIRMS LOCATED |
| | IN PALM BEACH COUNTY. |
| | B. VERIFICATION OF COMPLIANCE WITH THE WORKFORCE |
| | HOUSING REQUIREMENTS OF THE ROSEMARY SQUARE CENTER |
| | SUBAREA BY THE CITY'S HOUSING AND COMMUNITY DEVELOPMENT |
| | DEPARTMENT. |
| | C. VERIFICATION THAT THE BUILDING HAS BEEN CONSTRUCTED |
| | TO A LEED SILVER STANDARD OR EQUIVALENT RATING SYSTEM. |
| | D. VERIFICATION THAT THE CHARGING STATIONS AND THE RIDE |
| | SHARE SPACE HAVE BEEN INSTALLED WITHIN THE D GARAGE. |
| | E. WAYFINDING SIGNS MUST BE INSTALLED TO DIRECT |
| | PEDESTRIANS FROM THE D GARAGE TO THE RESIDENTIAL AND |
| | RETAIL ENTRANCES. |
| | F. PROVIDE VERIFICATION OF THE BICYCLE SHARE DISCOUNT |
| | MEMBERSHIP PROGRAM. |
| | G. A MINOR SUBDIVISION (REPLAT) APPLICATION MUST BE |
| | FILED WITH THE CITY'S PLANNING DIVISION AND BE APPROVED |
| | BY THE CITY COMMISSION. |
| | |
| | 3) PRIOR TO THE APPROVAL OF THE FINAL INSPECTION (104) |
| | FOR THE GROUND FLOOR SPACE THAT FRONTS THE ACCESS |
| | EASEMENT AT THE NORTH END TO THE SITE, A PUBLIC ACCESS |
| | EASEMENT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY'S |
| | OFFICE, FOR THE PUBLIC SPACE TERMINATING THE PUBLIC |
| | OPEN SPACE - PASSAGE, MUST BE RECORDED. |
| | |