Plan Review Notes
Plan Review Notes For Permit 22050891
Permit Number 22050891
Review Stop G
Sequence Number 1
Notes
Date Text
2022-10-21 08:08:14 
 1ST REVIEW FBC-2020 FUEL GAS
 PERMIT- 22050891
 10/20/2022
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. PLEASE NOTE THE GAS PLAN
 SUBMITTAL IS INCOMPLETE. PLEASE REVIEW THE COMMENTS AND
 DETERMINE IF THE GAS SYSTEMS, AND EQUIPMENT AND
 APPLIANCE INSTALLATIONS WILL REMAIN UNDER THE MASTER
 PERMIT, OR WILL BE INSTALLED UNDER SEPARATE PERMITS.
 THE CONTRACTOR HAS THE OPTION OF INCLUDING A PORTION OF
 THE SYSTEM (WATER HEATERS AND BOILER) UNDER THE MASTER
 WITH NOTES TO INDICATE THE KITCHEN, FIREPLACE, AND GAS
 GRILLS WILL BE INSTALLED UNDER SEPARATE PERMITS.
 CONCERNING THE POOL HEATERS PLEASE SEE COMMENT #12
 BELOW.
  
 1) SHEET FG001: PLEASE UPDATE THE CODE REFERENCES TO
 INDICATE THE 2020 FLORIDA FUEL GAS CODE 7TH EDITION-
 SEC. 107.2.1 WPB.
  
 2) FG001 DETAIL 1: PROVIDE PIPE UNIONS WITHIN 1 FT. OF
 EITHER SIDE OF THE REGULATOR- SEC. 410. 2(7) FBC FG.
  
 3) FG200 & FG201: TO HELP EXPEDITE THE REVIEW PLEASE
 PROVIDE THE BRANCH PIPE LENGTH MEASUREMENTS ON THE
 DRAWINGS AND THE TOTAL DEVELOPED LENGTH OF THE SYSTEM-
 SEC. 402.4.1 FBC FG.
  
 4) FG104A & FG200: PLEASE SHOW GAS TIGHT CAPS AT THE
 SUPPLY PIPES TO THE FUTURE KITCHEN APPLIANCES- SEC.
 404.15 FBC FG.
  
 5) FG001 & P503: SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR THE GAS WATER HEATERS (GWH 1-3)- SEC. 624.1 FBC FG.
 PLEASE NOTE INSTALLATION OF THE UNITS SHALL BE IN
 ACCORDANCE WITH THE MANUFACTURER'S GUIDELINES WHICH
 SHALL BE ONSITE FOR INSPECTION.
  
 6) FG001 & P503: PROVIDE EQUIPMENT SCHEDULES FOR THE
 MECHANICAL BOILERS AND SUBMIT MANUFACTURER'S
 SPECIFICATIONS- SEC. 631.1 FBC FG. PLEASE NOTE
 INSTALLATION OF THE UNITS SHALL BE IN ACCORDANCE WITH
 THE MANUFACTURER'S GUIDELINES WHICH SHALL BE ONSITE FOR
 INSPECTION.
  
 7) FG105A: PLEASE SUBMIT AN UPPER ROOF PLAN SHOWING THE
 TERMINATION LOCATIONS OF THE AIR INTAKE AND EXHAUST
 OUTLETS FOR THE DOMESTIC AND MECHANICAL BOILERS- SEC.
 503.6.5 FBC FG. PLEASE NOTE INSTALLATION OF THE UNITS
 SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
 GUIDELINES WHICH SHALL BE ONSITE FOR INSPECTION.
  
 8) FG105A: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 UL 1738 AIR INTAKE AND EXHAUST DUCTS- SECS. 502.1,
 5032.3, & 503.8 FBC FG. PLEASE NOTE INSTALLATION OF THE
 DUCT SHALL BE IN ACCORDANCE WITH THE MANUFACTURER???S
 GUIDELINES WHICH SHALL BE ONSITE FOR INSPECTION.
  
 9) FG200: SHOW THE TOTAL BTU LOAD OF THE WATER HEATERS
 AND BOILERS AT THE 3-INCH PIPE ENTRANCE INTO THE ROOM-
 SEC. 402.2 FBC FG.
  
 10) FG201: SHOW SUPPLY PIPE SIZES FROM THE SHUTOFF
 VALVES TO THE GAS WATER HEATERS- SEC. 402.3 FBC FG.
  
 11) FG201: IT APPEARS NO REGULATORS ARE TO BE INSTALLED
 AT THE BOILERS TO REDUCE THE 2 PSI INPUT PRESSURE.
 PLEASE INDICATE THE INPUT PRESSURE RATINGS OF THE
 UNITS- SEC. 410.1 & 631.1 FBC FG. A) SHOW SUPPLY PIPE
 SIZES FROM THE SHUTOFF VALVES TO THE UNITS- SEC. 402.3
 FBC FG.
  
 12) FG001 & P503: SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR THE POOL HEATERS- SEC. 617.1 FBC FG. PLEASE NOTE
 THAT INSTALLATION OF THE POOL HEATERS INCLUDING FINAL
 CONNECTIONS OF GAS AND PLUMBING PIPING SHALL BE UNDER
 SEPARATE PERMIT- SEC. 105.1 & 107.2.1 WPB. THE
 INSTALLATION OF THE UNITS SHALL BE IN ACCORDANCE WITH
 THE MANUFACTURER'S GUIDELINES WHICH SHALL BE ONSITE FOR
 INSPECTION. CONCERNING THE AIR INTAKE AND EXHAUST DUCTS
 PLEASE SEE COMMENT #8 ABOVE.
  
 13) FG201: SHOW SUPPLY PIPE SIZES FROM THE SHUTOFF
 VALVES TO THE POOL HEATERS- SEC. 402.3 FBC FG.
  
 14) FG200: SHOW THE APPROXIMATE GAS LOAD AT THE FUTURE
 KITCHEN- SEC. 402.3 FBC FG. AS NOTED, GAS TIGHT CAPS AT
 THE SUPPLY PIPES ARE REQUIRED FOR FUTURE.
  
 15) FG001, FG104A, FG200: SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE FIREPLACE AND FIREPLACE VENT
 SYSTEM AND PROVIDE AN EQUIPMENT SCHEDULE ON THE PLAN-
 SECS. 604.1 & 605.1 FBC FG.
  
 A) REVISE THE RISER DRAWING TO INCLUDE THE CSST PIPING
 CALLED OUT IN NOTE FG04 (SHEET FG104A).
  
 B) PROVIDE COMBUSTION AIR CALCULATIONS AND INDICATE HOW
 THE AIR IS TO BE PROVIDED- SEC. 304.1 FBC FG.
  
 C) PROVIDE A VENTING DIAGRAM INDICATING THE TYPE AND
 SIZE OF VENT FLUE, TOTAL VENT FLUE RUN AND TERMINATION
 LOCATION. SUBMIT SPECS FOR ALL COMPONENTS OF THE
 SYSTEM- SECS. 502.1 & 503.1 FBC FG.
  
 15) FG001, FG104A, FG200: SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE GAS GRILLS AND PROVIDE AN
 EQUIPMENT SCHEDULE ON THE PLAN- SECS. 623.1 FBC FG.
  
 A) PROVIDE INSTALLATION DETAILS ON THE PLAN SHOWING HOW
 THE UNITS WILL BE ANCHORED TO THE OUTDOOR COUNTER
 ASSEMBLIES AND HOW COMBUSTION AIR WILL BE PROVIDED-
 SEC. 107.2.1 WPB & SEC. 304.1 FBC FG.
  
 16) REFER TO SEC. C408.2 FBC ENERGY- PRIOR TO FINAL
 PLUMBING AND GAS APPROVAL, THE LICENSED DESIGN
 PROFESSIONAL, MECHANICAL ENGINEER, OR APPROVED AGENCY
 SHALL PROVIDE EVIDENCE OF MECHANICAL AND SERVICE WATER
 HEATING COMMISSIONING WITH THE APPLICABLE PROVISIONS OF
 SEC. C408. PLEASE SUBMIT A COMMISSIONING PLAN- SEC.
 C408.2.1.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  