| Date |
Text |
| 2022-10-17 17:10:38 | FLORIDA BUILDING CODE 2020 7TH EDITION |
| | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED |
| | NFPA 70 2017 EDITION |
| | |
| | JAKE LEAHY |
| | ELECTRICAL PLANS EXAMINER II |
| | 561-805-6713 |
| | [email protected] |
| | |
| | 1) E-102A MAIN ELECTRICAL ROOM LAYOUT |
| | |
| | 110.26(C)(2)(A,B) EGRESS PATH CROSSING IN FRONT OF |
| | MS-R2 AT THE DOOR, YOU HAVE TO TRAVEL THROUGH THE |
| | REQUIRED WORKING SPACE IN ORDER TO EXIT THE ROOM. |
| | PLEASE PROVIDE A CLEAR UNOBSTRUCTED PATH. |
| | |
| | 110.26(C)(2)(B) EXTRA WORKING SPACE. WHERE THE DEPTH OF |
| | THE WORKING SPACE IS TWICE THAT REQUIRED BY |
| | 110.26(A)(1), A SINGLE ENTRANCE SHALL BE PERMITTED. IT |
| | SHALL BE LOCATED SUCH THAT THE DISTANCE FROM THE |
| | EQUIPMENT TO THE |
| | NEAREST EDGE OF THE ENTRANCE IS NOT LESS THAN THE |
| | MINIMUM CLEAR DISTANCE SPECIFIED IN TABLE 110.26(A)(1) |
| | FOR EQUIPMENT OPERATING AT THAT VOLTAGE AND IN THAT |
| | CONDITION. |
| | |
| | 2) E-301, 302 LOAD CALCULATIONS LOAD CALCULATIONS SHOWN |
| | USE A DEMANDED LOAD CALCULATION AND THEN AGAIN DEMAND |
| | IT FOR A FINAL LOAD??? PLEASE SHOW HOW YOUR LOAD CALC |
| | COMPLIES WITH 220.84 OR WHATEVER YOU ARE USING. |
| | |
| | 3) E-502 RISER DIAGRAM PLEASE SHOW COMPLIANCE WITH |
| | 700.3(F) FOR BACKUP GENERATOR. |
| | |
| | 700.3 (F) TEMPORARY SOURCE OF POWER FOR MAINTENANCE OR |
| | REPAIR OF THE ALTERNATE SOURCE OF POWER. |
| | |
| | 4) THE FOLLOWING SYSTEMS SHALL BE REQUIRED TO GET |
| | SEPARATE PERMITS LIGHTNING PROTECTION, POOL, GENERATOR, |
| | FIRE ALARM, BDA, SECURITY, ACCESS CONTROL ECT. ECT. |