Plan Review Notes
Plan Review Notes For Permit 22050319
Permit Number 22050319
Review Stop ENG
Sequence Number 3
Notes
Date Text
2022-09-19 10:25:49PASSED WITH PROVISOS:
  
 DO NOT CONSTRUCT DRIVEWAY OR DRIVEWAY APRON ON TOP OF
 WATER METERS, SANITARY CLEANOUTS, OR STORMWATER INLETS.
 PROTECT STORM DRAIN INLETS IN VICINITY FROM
 CONSTRUCTION RUNOFF AND DEBRIS USING BEST MANAGEMENT
 PRACTICES (FILTER FABRIC, ETC.)
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
  
  
  