| Date |
Text |
| 2022-05-09 15:25:30 | RENOVATION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) NEW STAIR SHOULD SHOW HAND RAILS ON BOTH SIDES FBC |
| | 1011.11 HANDRAILS. |
| | FLIGHTS OF STAIRWAYS SHALL HAVE HANDRAILS ON EACH SIDE |
| | AND SHALL COMPLY WITH SECTION 1014. |
| | |
| | 2) PLEASE SHOW HAND RAIL DETAILS (ATTACHMENTS, HEIGHT |
| | ETC.) FBC 1014 |
| | |
| | 3) PLEASE SHOW STAIR RISER AND TREAD SIZES FBC 1011.5.2 |
| | |
| | 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE ROOFING - ALL PRODUCT |
| | APPROVALS NEED TO BE REVIEWED AND MARKED APPROVED BY |
| | THE DESIGNER OF RECORD FBC WPB 107.3.4 |
| | |
| | 5) PROJECT IS A SUBSTANTIAL IMPROVEMENT - A VARIANCE IS |
| | REQUIRED -- THE CONSTRUCTION BOARD OF ADJUSTMENT AND |
| | APPEALS GRANTS THE EXCEPTION TO THE FLOOD ELEVATION |
| | REQUIREMENT FOR HISTORIC PROPERTIES. - ORDINANCE NO. |
| | 4729-17 SEC. 18-286 (D) HISTORIC BUILDINGS. A VARIANCE |
| | IS AUTHORIZED TO BE ISSUED FOR THE REPAIR, IMPROVEMENT, |
| | OR REHABILITATION OF A HISTORIC BUILDING THAT IS |
| | DETERMINED ELIGIBLE FOR THE EXCEPTION TO THE FLOOD |
| | RESISTANT CONSTRUCTION REQUIREMENTS OF THE FLORIDA |
| | BUILDING CODE, EXISTING BUILDING, CHAPTER 12 HISTORIC |
| | BUILDINGS, |
| | |
| | 6) ROOFING SYSTEM PRODUCT APPROVALS MAY BE DEFERRED |
| | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| | CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |