| Date |
Text |
| 2022-05-05 16:45:08 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| | 7TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| | FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH |
| | EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| | FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 22040585 625 N FLAGLER DR # 400 |
| | 1ST REVIEW |
| | |
| | GAS COMMENTS: DENIED |
| | |
| | |
| | 1. PER WPB FBC 107.2.1, SHOW ALL REGULATORS AND SHUT |
| | OFF VALVES (INCLUDING THE METER/REGULATOR) ON THE RISER |
| | DIAGRAM. |
| | |
| | |
| | 2. P3.02: PER WPB FBC 107.2.1, PLEASE TAG PIPE LENGTHS |
| | ON RISER DIAGRAM AND MATCH WITH PIPE LENGTHS ON LONGEST |
| | RUN CHART. CHART SHOWS ALL LENGTHS AS G2 PIPING SYSTEM |
| | (IT IS UNDERSTOOD THAT THE SYSTEM IS G2). I AM BETTER |
| | SERVED TO REVIEW IF YOU TAG EACH LENGTH IN THE CHART |
| | SEQUENTIALLY; I.E. G1, G2, G3, ETC. SHOW THE METER; THE |
| | UNDERGROUND SECTION EXTENDING TO THE METER/REGULATOR |
| | SHALL BE TAGGED AND INCLUDED IN THE CALCULATIONS. |
| | |
| | |
| | 3. PER WPB FBC 102.1, PLEASE PROVIDE DETAIL AND |
| | MANUFACTURER'S SPECIFICATION/INSTALLATION MANUAL FOR |
| | EMERGENCY GENERATOR EXHAUST. |
| | |
| | |
| | 4. PER WPB FBC 102.1, PLEASE PROVIDE A GROUND FLOOR |
| | PLAN SHOWING LOCATION OF THE GAS METER/REGULATOR. PER |
| | WPB FBC 107.2.1, THE SIZING CALCULATIONS SHALL INCLUDE |
| | EXTENSION OF UNDERGROUND PIPING TO THE METER. |
| | |
| | |
| | 5. PER WPB FBC 107.2.1, PLEASE SPECIFY THE FITTINGS AND |
| | JOINTS TO BE USED IN THE SCHEDULE 40 STEEL PIPING |
| | SYSTEM NOTED IN SUBMITTED FBC FG TABLE 402.4(2). |
| | |
| | |
| | 6. PER FBC FG 616.1, PERMANENTLY INSTALLED EQUIPMENT |
| | POWERED BY INTERNAL COMBUSTION ENGINES AND TURBINES |
| | SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| | MANUFACTURER'S INSTRUCTIONS AND NFPA 37. PER WPB FBC |
| | 107.2.1, PROVIDE MANUFACTURER'S |
| | SPECIFICATION/INSTALLATION MANUAL FOR THE EMERGENCY |
| | GENERATOR. |
| | |
| | |
| | 7. P4.00/GAS CONNECTION DETAIL: |
| | ***A) PER FBC FG 616.2, EQUIPMENT POWERED BY INTERNAL |
| | COMBUSTION ENGINES AND TURBINES SHALL NOT BE RIGIDLY |
| | CONNECTED TO THE GAS SUPPLY PIPING. PER WPB FBC |
| | 107.2.1, SHOW ON DETAIL AND SPECIFY A FLEXIBLE |
| | CONNECTOR. |
| | ***B) PER WPB FBC 107.2.1, DETAIL SHALL REFLECT |
| | CONDITIONS OF THE RISER DIAGRAM, RISING THROUGH THE |
| | SLAB AND CONNECTING. |
| | ***C) PER WPB FBC 107.2.1, PROVIDE SUPPORT STRUCTURE(S) |
| | FOR THE HORIZONTAL RIDGED PORTION OF THE PIPING IN |
| | ACCORDANCE WITH FBC FG 407.2. |
| | ***D) PER FBC FG 410.2.7, THE UNION SHALL BE INSTALLED |
| | WITHIN 1 FOOT OF EITHER SIDE OF THE REGULATOR. |
| | |
| | |
| | 8. SPECIFY THE SECONDARY REGULATOR. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE PRESSURE |
| | REGULATOR. REGULATORS INSTALLED ON THE EXTERIOR OF THE |
| | BUILDING SHALL BE APPROVED FOR OUTDOOR INSTALLATION. |
| | PER FBC FG 410.1. |
| | |
| | |
| | 9. PROVIDE MATERIAL SPECIFICATION FOR UNDERGROUND |
| | PIPING (NOTED ON P3.02 GAS RISER DIAGRAM). |
| | ***A) PER FBC FG 404.11, STEEL PIPE OR TUBING EXPOSED |
| | TO CORROSIVE ACTION, SUCH AS SOIL CONDITION OR |
| | MOISTURE, SHALL BE PROTECTED IN ACCORDANCE WITH |
| | SECTIONS 404.11.1 THROUGH 404.11.5. |
| | *****1) 404.11.: GALVANIZING. |
| | ZINC COATING SHALL NOT BE DEEMED ADEQUATE PROTECTION |
| | FOR UNDERGROUND GAS PIPING. |
| | *****2) 404.11.2: PROTECTION METHODS. |
| | UNDERGROUND PIPING SHALL COMPLY WITH ONE OR MORE OF THE |
| | FOLLOWING: |
| | ***AA.THE PIPING SHALL BE MADE OF CORROSION-RESISTANT |
| | MATERIAL THAT IS SUITABLE FOR THE ENVIRONMENT IN WHICH |
| | IT WILL BE INSTALLED. |
| | ***BB.PIPE SHALL HAVE A FACTORY-APPLIED, ELECTRICALLY |
| | INSULATING COATING. FITTINGS AND JOINTS BETWEEN |
| | SECTIONS OF COATED PIPE SHALL BE COATED IN ACCORDANCE |
| | WITH THE COATING MANUFACTURER'S INSTRUCTIONS. |
| | ***CC.THE PIPING SHALL HAVE A CATHODIC PROTECTION |
| | SYSTEM INSTALLED AND THE SYSTEM SHALL BE MONITORED AND |
| | MAINTAINED IN ACCORDANCE WITH AN APPROVED PROGRAM. |
| | |
| | ***B) PLEASE NOTE THAT IF PLASTIC PIPE IS USED IN |
| | ACCORDANCE WITH FBC FG 404.17, A CORRESPONDING SIZING |
| | TABLE SHALL BE PROVIDED. |
| | |
| | |
| | 10. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE |
| | UNDERGROUND PIPING TRANSITIONS TO ABOVE GROUND. |
| | |
| | |
| | 11. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE |
| | METER/REGULATOR AND DOWNSTREAM PIPING |
| | |
| | |
| | 12. THE INSTALLATION MANUALS FOR ALL GAS APPLIANCES / |
| | EQUIPMENT SHALL BE ONSITE AT THE TIME OF INSPECTION PER |
| | FBC FG 305.1 |
| | |
| | |
| | END OF COMMENTS. |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED |
| | AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER PX928 |
| | PLUMBING INSPECTOR BN2148 |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-246-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS |
| | |