Plan Review Notes
Plan Review Notes For Permit 22040585
Permit Number 22040585
Review Stop G
Sequence Number 1
Notes
Date Text
2022-05-05 16:45:08CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22040585 625 N FLAGLER DR # 400
 1ST REVIEW
  
 GAS COMMENTS: DENIED
  
  
 1. PER WPB FBC 107.2.1, SHOW ALL REGULATORS AND SHUT
 OFF VALVES (INCLUDING THE METER/REGULATOR) ON THE RISER
 DIAGRAM.
  
  
 2. P3.02: PER WPB FBC 107.2.1, PLEASE TAG PIPE LENGTHS
 ON RISER DIAGRAM AND MATCH WITH PIPE LENGTHS ON LONGEST
 RUN CHART. CHART SHOWS ALL LENGTHS AS G2 PIPING SYSTEM
 (IT IS UNDERSTOOD THAT THE SYSTEM IS G2). I AM BETTER
 SERVED TO REVIEW IF YOU TAG EACH LENGTH IN THE CHART
 SEQUENTIALLY; I.E. G1, G2, G3, ETC. SHOW THE METER; THE
 UNDERGROUND SECTION EXTENDING TO THE METER/REGULATOR
 SHALL BE TAGGED AND INCLUDED IN THE CALCULATIONS.
  
  
 3. PER WPB FBC 102.1, PLEASE PROVIDE DETAIL AND
 MANUFACTURER'S SPECIFICATION/INSTALLATION MANUAL FOR
 EMERGENCY GENERATOR EXHAUST.
  
  
 4. PER WPB FBC 102.1, PLEASE PROVIDE A GROUND FLOOR
 PLAN SHOWING LOCATION OF THE GAS METER/REGULATOR. PER
 WPB FBC 107.2.1, THE SIZING CALCULATIONS SHALL INCLUDE
 EXTENSION OF UNDERGROUND PIPING TO THE METER.
  
  
 5. PER WPB FBC 107.2.1, PLEASE SPECIFY THE FITTINGS AND
 JOINTS TO BE USED IN THE SCHEDULE 40 STEEL PIPING
 SYSTEM NOTED IN SUBMITTED FBC FG TABLE 402.4(2).
  
  
 6. PER FBC FG 616.1, PERMANENTLY INSTALLED EQUIPMENT
 POWERED BY INTERNAL COMBUSTION ENGINES AND TURBINES
 SHALL BE INSTALLED IN ACCORDANCE WITH THE
 MANUFACTURER'S INSTRUCTIONS AND NFPA 37. PER WPB FBC
 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUAL FOR THE EMERGENCY
 GENERATOR.
  
  
 7. P4.00/GAS CONNECTION DETAIL:
 ***A) PER FBC FG 616.2, EQUIPMENT POWERED BY INTERNAL
 COMBUSTION ENGINES AND TURBINES SHALL NOT BE RIGIDLY
 CONNECTED TO THE GAS SUPPLY PIPING. PER WPB FBC
 107.2.1, SHOW ON DETAIL AND SPECIFY A FLEXIBLE
 CONNECTOR.
 ***B) PER WPB FBC 107.2.1, DETAIL SHALL REFLECT
 CONDITIONS OF THE RISER DIAGRAM, RISING THROUGH THE
 SLAB AND CONNECTING.
 ***C) PER WPB FBC 107.2.1, PROVIDE SUPPORT STRUCTURE(S)
 FOR THE HORIZONTAL RIDGED PORTION OF THE PIPING IN
 ACCORDANCE WITH FBC FG 407.2.
 ***D) PER FBC FG 410.2.7, THE UNION SHALL BE INSTALLED
 WITHIN 1 FOOT OF EITHER SIDE OF THE REGULATOR.
  
  
 8. SPECIFY THE SECONDARY REGULATOR. SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE PRESSURE
 REGULATOR. REGULATORS INSTALLED ON THE EXTERIOR OF THE
 BUILDING SHALL BE APPROVED FOR OUTDOOR INSTALLATION.
 PER FBC FG 410.1.
  
  
 9. PROVIDE MATERIAL SPECIFICATION FOR UNDERGROUND
 PIPING (NOTED ON P3.02 GAS RISER DIAGRAM).
 ***A) PER FBC FG 404.11, STEEL PIPE OR TUBING EXPOSED
 TO CORROSIVE ACTION, SUCH AS SOIL CONDITION OR
 MOISTURE, SHALL BE PROTECTED IN ACCORDANCE WITH
 SECTIONS 404.11.1 THROUGH 404.11.5.
 *****1) 404.11.: GALVANIZING.
 ZINC COATING SHALL NOT BE DEEMED ADEQUATE PROTECTION
 FOR UNDERGROUND GAS PIPING.
 *****2) 404.11.2: PROTECTION METHODS.
 UNDERGROUND PIPING SHALL COMPLY WITH ONE OR MORE OF THE
 FOLLOWING:
 ***AA.THE PIPING SHALL BE MADE OF CORROSION-RESISTANT
 MATERIAL THAT IS SUITABLE FOR THE ENVIRONMENT IN WHICH
 IT WILL BE INSTALLED.
 ***BB.PIPE SHALL HAVE A FACTORY-APPLIED, ELECTRICALLY
 INSULATING COATING. FITTINGS AND JOINTS BETWEEN
 SECTIONS OF COATED PIPE SHALL BE COATED IN ACCORDANCE
 WITH THE COATING MANUFACTURER'S INSTRUCTIONS.
 ***CC.THE PIPING SHALL HAVE A CATHODIC PROTECTION
 SYSTEM INSTALLED AND THE SYSTEM SHALL BE MONITORED AND
 MAINTAINED IN ACCORDANCE WITH AN APPROVED PROGRAM.
  
 ***B) PLEASE NOTE THAT IF PLASTIC PIPE IS USED IN
 ACCORDANCE WITH FBC FG 404.17, A CORRESPONDING SIZING
 TABLE SHALL BE PROVIDED.
  
  
 10. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE
 UNDERGROUND PIPING TRANSITIONS TO ABOVE GROUND.
  
  
 11. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE
 METER/REGULATOR AND DOWNSTREAM PIPING
  
  
 12. THE INSTALLATION MANUALS FOR ALL GAS APPLIANCES /
 EQUIPMENT SHALL BE ONSITE AT THE TIME OF INSPECTION PER
 FBC FG 305.1
  
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved