| Plan Review Notes For Permit 22040090 |
| Permit Number |
22040090 |
|
| Review Stop |
ENG |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-05-23 11:47:56 | PAVER AGREEMENT WAS NOT RECORDED/STAMPED AT COURTHOUSE. | | | PLEASE NOTE THAT PAVER AGREEMENT IS ONLY REQUIRED IF | | | PAVERS ARE BEING PLACED IN THE RIGHT OF WAY/OUTSDIE OF | | | PROPERTY. | | | | | | SIDEWALK PORTION OF DRIVEWAY SHALL BE 6" THICK PER CITY | | | OF WPB STANDARD DETAIL. CONSTRUCT DRIVEWAY APRON IN | | | COMPLIANCE WITH WPB CONSTRUCTION STANDARD DETAIL GC-5 | | | (WHEN DISTANCE BETWEEN CURB OR EDGE OF PAVEMENT IS 10 | | | FT. OR GREATER), OR STANDARD DETAIL GC-6 (WHEN DISTANCE | | | BETWEEN CURB OR EDGE OF PAVEMENT IS LESS THAN 10 FT.) | | | CITY STANDARD DETAIL IS REQUIRED, SEE LINK BELOW: | | | HTTPS://WWW.WPB.ORG | | | /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS | | | | | | CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF | | | CONSTRUCTION. DO NOT CONSTRUCT DRIVEWAY APRON ON TOP OF | | | WATER METER, STROM INLET, SANITARY CLEANOUT ETC. | | | | | | | | | THANKS, | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB | | | ENGINEERING SERVICES DEPARTMENT | | | (561) 494-1098, FAX: (561) 494-1116 EMAIL: | | | [email protected] | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | |
|