| 2022-04-05 09:05:31 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected]. |
| | |
| | 1. SUBMITTED PRODUCT APPROVAL FL5680-R27 HAS BEEN |
| | REVISED TO FL5680-R33. PLEASE PROVIDE A COMPLETE SET. |
| | INCLUDE COVER PAGE, EVALUATION REPORTS PAGES 1-6 TO |
| | INCLUDE LIMITATIONS PAGE(S)AND INSTALLATION |
| | INSTRUCTIONS FOR SYSTEM USED. ALL APPLICABLE DETAILS |
| | AND ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE |
| | PRODUCT APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| | SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| | SITE-SPECIFIC ENGINEERING. AS PER RULE 61G20-3. |
| | 2. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| | APPROVAL FL5680-R27 SYSTEM NO. W-63 DOES NOT MEET THE |
| | MINIMUM ZONE 3 DESIGN PRESSURE REQUIREMENT OF -108.17 |
| | FOR EXPOSURE CATEGORY C AREAS. PROVIDE SYSTEM THAT |
| | MEETS OR EXCEEDS ALL DESIGN PRESSURE REQUIREMENTS FOR |
| | EXPOSURE CATEGORY C/PROVIDE SIGNED AND SEALED |
| | ENGINEERED NAILING CALCULATIONS WITH AN APPROVED |
| | SYSTEM. |
| | 3. FBC R 905.1.1 ASPHALT SHINGLE, METAL, MINERAL |
| | SURFACE, SLATE AND SLATE-TYPE ROOFING MUST COMPLY WITH |
| | NEW 2020 BUILDING CODE UNDERLAYMENT REQUIREMENTS. |
| | PROVIDE METHOD OF COMPLIANCE. (IF USING DOUBLE 30# FELT |
| | INDICATE ON ROOF DRAWING/SKETCH). |
| | 4. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| | DIAGRAM/SKETCH AND INCLUDE ROOF SLOPE(S), MEAN ROOF |
| | HEIGHT(S). LOW SLOPE ROOFS MUST SHOW POSITIVE DRAINAGE. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |