| 2022-12-07 11:17:46 | THIS PLAN WAS REVIEWED AND APPROVED BY THE FIRE |
| | DEPARTMENT, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | ANY AND ALL WORK ON THE FIRE ALARM SYSTEM SHALL BE DONE |
| | BY A FIRE ALARM CONTRACTOR. A SEPARATE SHOP DRAWING |
| | COMPLIANT WITH NFPA 72 IS REQUIRED TO BE SUBMITTED, |
| | REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU |
| | PRIOR TO ANY INSTALLATION. |
| | |
| | ALL WORK ON THE FIRE SPRINKLER SYSTEM IS REQUIRED TO BE |
| | COMPLETED BY A CERTIFIED FIRE SPRINKLER CONTRACTOR AND |
| | SHALL COMPLY WITH NFPA 13. SEPARATE SHOP DRAWINGS, ARE |
| | REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY THE |
| | FIRE PREVENTION BUREAU PRIOR TO ANY WORK ON THE SYSTEM. |
| | |
| | THE LIFE SAFETY SYSTEMS, SPRINKLER AND/OR FIRE ALARM, |
| | SHALL REMAIN ACTIVE THROUGHOUT THE CONSTRUCTION PERIOD. |
| | NO EXIT DOOR SHALL BE LOCKED FROM THE EGRESS SIDE. ANY |
| | AND ALL LOCKING MECHANISMS SHALL BE COMPLAINT WITH |
| | CHAPTER 7 OF THE FLORIDA FIRE PREVENTION CODE AND |
| | PRE-APPROVED (PRIOR TO INSTALLATION) BY THE BUREAU OF |
| | FIRE PREVENTION. CLOSE COORDINATION WITH THE BUREAU OF |
| | FIRE PREVENTION IS STRONGLY ENCOURAGED TO AVOID |
| | MISUNDERSTANDINGS, MISINTERPRETATIONS AND DELAYS |
| | RELATED TO EGRESS REQUIREMENTS. |
| | |
| | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, |
| | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE |
| | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL |
| | AND COMPLETE PROTECTION IS RETURNED. |
| | ENSURE THAT EMERGENCY EXIT LIGHTING IS SUPPLIED FOR ALL |
| | EXITS AND EXITS PATHS. A COMBINATION EXIT/EMERGENCY IS |
| | ACCEPTABLE. |
| | |
| | THE FIRE DEPARTMENT HAS NO OBJECTIONS TO A CHANGE OF |
| | OCCUPANCY BASED ON THE PLAN SET PROVIDED. |
| | |
| | PER CITY CODES, ALL WORK IS SUBJECT TO FIELD |
| | INSPECTIONS AND APPROVAL. |
| | |
| | CAPT. BRIAN DOLAN |
| | DIVISION OF FIRE PREVENTION |
| | 561-804-4752 |
| | [email protected] |
| | |
| | |
| | |