| Date |
Text |
| 2022-02-08 12:06:16 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected] AND REQUEST |
| | THAT IT BE CONVERTED TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1. SUBMITTED FLORIDA DBPR PRODUCT |
| | APPROVAL FL7849-R14 HAS BEEN REVISED TO FL7849-R15. |
| | PLEASE PROVIDE A COMPLETE SET OF PRODUCT APPROVALS. |
| | INCLUDE COVER PAGE, EVALUATION REPORTS AND INSTALLATION |
| | INSTRUCTIONS FOR SYSTEM USED. ALL APPLICABLE DETAILS |
| | AND ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE |
| | PRODUCT APPROVAL DRAWINGS. |
| | 2. FBC B 107.2.1 SUBMITTED PRODUCT APPROVAL FL5259-R33 |
| | HAS BEEN REVISED TO FL5259-R34. PLEASE PROVIDE A |
| | COMPLETE SET; IT COVERS MULTIPLE PRODUCT TYPES; ROOF |
| | COVER OPTIONS; ALLOWABLE UNDERLAYMENT/TILE-ADHESIVE |
| | COMBINATIONS & ALLOWABLE SUBSTRATES. SELECT OPTIONS TO |
| | BE USED. ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE |
| | CLEARLY IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| | DETAILS AND ATTACHMENTS NOT SPECIFICALLY COVERED IN |
| | PRODUCT APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| | 3. WPB A 109.3 BUILDING PERMIT VALUATIONS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, |
| | QUANTITY ESTIMATES. VALUE TO INCLUDE LABOR AND |
| | MATERIALS, ARCHITECTURAL AND DESIGN FEES, OVERHEAD AND |
| | PROFIT. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |