| Date |
Text |
| 2022-03-03 13:09:15 | RESIDENTIAL (R3) REVISION SECOND BUILDING REVIEW |
| | COMMENTS |
| | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. |
| | REVISION #22011190 |
| | |
| | 1- OK. |
| | |
| | ORIGINAL COMMENT: |
| | 2- ATTIC BREEZE PRODUCT APPROVAL SUBMITTED STATES UNDER |
| | LIMITS OF USE ON PAGE 4 OF 6 THAT "DESIGN OF SUPPORT |
| | SYSTEM IS OUTSIDE THE SCOPE OF THIS REPORT". THIS |
| | PRODUCT APPROVAL IS FOR A FAN TO BE MOUNTED ON A WOOD |
| | OR STEEL & ALUMINUM CURB. PROVIDE COMPLETE DETAILS AND |
| | SPECIFICATIONS FOR THE CONSTRUCTION OF THE CURB SHOWING |
| | COMPLIANCE WITH THE WIND DESIGN CRITERIA OF SEC. |
| | R301.2.1 FBC-RESIDENTIAL. |
| | NOTE: BUILDING SUBPERMIT MAY BE REQUIRED FOR FRAMING |
| | INSPECTION. |
| | |
| | RESPONSE: |
| | ROOF CURB INSTALLATION GUIDE SUBMITTED DOESN'T ADDRESS |
| | THE WIND DESIGN CRITERIA. THE WIND DESIGN CRITERIA IS |
| | REQUIRED. PROVIDE CURB ENGINEERING SHOWING COMPLIANCE |
| | WITH THE WIND DESIGN CRITERIA. SEC. 107.2.1.2 CITY |
| | AMENDMENTS. |
| | NOTE: ENGINEER OF RECORD FOR ATTIC BREEZE FAN DOESN'T |
| | INCLUDE THE CURB ASSEMBLY. SEE PRODUCT ASSEMBLY AS |
| | EVALUATED INFORMATION ON PAGE 2 OF 6 OF PRODUCT |
| | APPROVAL FL13339.4 R9 SUBMITTED. |
| | |
| | ORIGINAL COMMENT. |
| | 3- THIS VENT IS ADDITIONAL WORK. PROVIDE THE VALUE FOR |
| | ALL ADDITIONAL WORK. SEC. 109.3 CITY AMENDMENTS. |
| | |
| | RESPONSE: |
| | NOT ADDRESSED. |
| | |
| | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE |
| | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF THE |
| | REVISION MADE WILL HELP TO EXPEDITE THE REVIEW PROCESS. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| | QUESTIONS REGARDING THESE COMMENTS, |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |