| Plan Review Notes For Permit 22011094 |
| Permit Number |
22011094 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-12-13 16:53:33 | 1ST REVIEW FBC-2020 PLUMBING | | | PERMIT-22011094 | | | 12/13/22 | | | | | | CODES IN EFFECT: | | | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THE PLANS DO NOT CLEARLY ILLUSTRATE IF A ROOF | | | DRAINAGE SYSTEM WILL BE INSTALLED TO CONVEY RAINWATER | | | FROM THE NEW ROOFS TO AN APPROVED DISPOSAL LOCATION- | | | SEC. 1102.1 FBC P. | | | | | | ROOF DRAINAGE PLANS SHALL INCLUDE: | | | A) RAINFALL RATE AND ROOF SQUARE FOOT AND GPM FLOW | | | CALCULATIONS- SEC. 1106.1 | | | B) A STORM DRAIN ISOMETRIC DRAWING SHOWING THE ROOF | | | DRAIN VERTICAL LEADERS AND HORIZONTAL STORM DRAIN SIZES | | | AND LOCATIONS OF REQUIRED CLEANOUTS- SECS. 1106.1, | | | 1106.1, & 1108.1. | | | C) SIZING CALCULATIONS AND LOCATIONS OF SECONDARY ROOF | | | DRAINS IF REQUIRED- SEC.1108.3. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL/PLUMBING PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|