| Date |
Text |
| 2022-01-24 09:18:45 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected] AND REQUEST |
| | THAT IT BE CONVERTED TO PROJECTDOX. |
| | |
| | 1. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED ROOF COATING TO BE |
| | USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND |
| | INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| | APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| | AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| | APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| | 2. FBC EB 706.3. ROOF RECOVERS/COATING REQUIRE |
| | DOCUMENTAL EVIDENCE THAT THE EXISTING ROOF SYSTEM DO |
| | NOT HAVE CONDITIONS LISTED IN 706.3 ITEMS #1-#5 OF THE |
| | 2020 FBC EXISTING BUILDING; TO INCLUDE A SIGNED AND |
| | SEALED MOISTURE REPORT SEALED BY A FLORIDA REGISTERED |
| | PROFESSIONAL ENGINEER, REGISTERED ARCHITECT, OR |
| | REGISTERED ROOF CONSULTANT. |
| | 3. FBC B 107.2.1. PROVIDE AN AERIAL MAP OF THE ENTIRE |
| | COMPLEX WITH THE BUILDING TO RECEIVE NEW ROOF COATING |
| | CLEARLY IDENTIFIED ON DRAWING. |
| | 4. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| | DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| | CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), |
| | MEAN ROOF HEIGHT(S). |
| | 5. FBC B 107.2.1 PROPOSED WORK REQUIRES ROOFING |
| | CONTRACTORS LICENSE. PLEASE PROVIDE. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |