Plan Review Notes
Plan Review Notes For Permit 22010705
Permit Number 22010705
Review Stop B
Sequence Number 3
Notes
Date Text
2022-03-10 11:26:13PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
  
 3. UTILITY RELEASE ? CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT?SERVICES/FORMS/B
 UILDING?PERMIT?FORMS
 (THIS FORM NEEDS TO BE COMPLETED BY UTILITIES AND
 RETURNED TO THE APPLICANT, AFTER RECEIVING THE
 COMPLETED FORM, UPLOAD COMPLETED FORM TO PROJECT DOX
 FOR BUILDING REVIEW).
  
 IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY?S UTILITIES DEPT, 561?822?2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561?822?2183.
 (THE BACKFLOW (PERMIT # 22030186 NEEDS AN APPROVED
 FINAL FIELD INSPECTION).
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 (THE SEWER LATERAL CAPPING PERMIT # 22030126 NEEDS AN
 APPROVED FINAL FIELD INSPECTION).
  
 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
 (NEED TO SHOW SILT FENCE ON PLAN SHEET).
  