| Date |
Text |
| 2022-07-21 13:48:45 | BUILDING REVIEW APPROVED WITH PROVISO. (NOTE: PROVIDE |
| | INFORMATION FOR REVIEW PRIOR TO INSPECTIONS TO AVOID |
| | CONFLICTS/DELAYS): |
| | 1- PROVIDE DRAINAGE PLAN SHOWING HOW THE SURFACE |
| | DRAINAGE DOESN'T AFFECT NEIGHBORS. |
| | 2- SOFFIT CONSTRUCTION: PROVIDE SPECIFICATIONS FOR TYPE |
| | OF METAL PLASTER BASE FOR CEILINGS SHOWING COMPLIANCE |
| | WITH TABLE 3 OF ASTM C1063. |
| | 3- PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC |
| | 61G20-3.001 FOR: |
| | A) FLAT ROOF. NOTE: CLEARLY MARK WHICH APPROVED |
| | INSULATED ASSEMBLY AS SPECIFIED ON PLANS IS GOING TO BE |
| | INSTALLED. |
| | B) OVERHEAD GARAGE DOOR MEETING THE DESIGN PRESSURES |
| | CALCULATED BY THE ARCHITECT ON SHEET D-1. |
| | C) INSWING ENTRY DOOR AS SHOWN ON PLANS. |
| | D) NEW HORIZONTAL ROLLING WINDOW AS SHOWN ON PLANS. |
| | PLANS SHOW 2 PANEL WINDOW SIZE 111"X58". |
| | E) CLARIFY WHY SUBMITTING NOA FOR SINGLE HUNG WINDOWS. |
| | NOTE: IF REPLACING WINDOWS IN EXISTING BEDROOMS, THEN |
| | SPECIFY SIZE AND TYPE OF EXISTING WINDOW AND SIZE AND |
| | TYPE OF PROPOSED WINDOW. |
| | 4- ARCHITECT TO APPROVE ABOVE PRODUCT APPROVALS. |
| | 5- PROVIDE CURRENT ICYNENE ICC EVALUATION REPORT. |
| | (ARCHITECT TO APPROVE THE REPORT). |
| | 6- REVISE ENERGY CALCULATIONS: |
| | A) PROVIDE COMPLETE INFORMATION ON TOP OF FORM, |
| | INCLUDING OWNER'S NAME, BUILDER'S NAME. |
| | B) DESIGN LOCATION SPECIFIED ON PAGE 1 IS INCORRECT. |
| | C) ENERGY CALCULATIONS NEED TO BE SITE SPECIFIC. REVISE |
| | CALCULATIONS AS REQUIRED. |
| | D) WALL INSULATION R-VALUE SPECIFIED ON ITEM #10(A) |
| | DOESN'T MATCH PLANS. REVISE AS REQUIRED TO MATCH. |
| | E) ITEM #16 ON PAGE 1 IS TAKING CREDIT FOR CEILING FANS |
| | AND CROSS VENTILATION. REVISE AS REQUIRED OR PROVIDE |
| | COMPLETE INFORMATION SHOWING HOW COMPLYING WITH THESE |
| | CREDITS. |
| | F) HOT WATER SYSTEM SPECIFIED ON PAGE 1 DOESN'T MATCH |
| | PLANS. REVISE AS REQUIRED. |
| | G) PROVIDE THE NAME OF THE PERSON DOING THE |
| | CALCULATIONS AS REQUIRED BY SEC. R405.4.2.1 FBC-ENERGY |
| | CONSERVATION. |
| | H) ATTIC AREA SPECIFIED ON PAGE 2 IS INCORRECT. SEE |
| | PLANS AND REVISE. |
| | I) DOORS INFORMATION SHOWN ON PAGE 3 DOESN'T MATCH |
| | PLANS. SEE PLANS AND REVISE AS REQUIRED. SEC. |
| | R101.5.1.1.2 FBC-ENERGY CONSERVATION. |
| | NOTE: GLAZING IN DOORS NEEDS TO BE INCLUDED IN THE |
| | WINDOW GLAZING AREA. SEE SEC. R405.5.3 FBC-ENERGY |
| | CONSERVATION). ALSO, CHECK MATERIAL OF SPECIFIED DOORS |
| | (METAL, WOOD, INSULATED FIBERGLASS, ETC.) |
| | J) WINDOWS INFORMATION SHOWN ON PAGE 3 DOESN'T MATCH |
| | PLANS. SEE PLANS AND REVISE AS REQUIRED. SEC. |
| | R101.5.1.1.2 FBC-ENERGY CONSERVATION. |
| | ALSO, CHECK MATERIAL OF SPECIFIED WINDOWS (VINYL OR |
| | METAL). |
| | NOTE: COORDINATE WITH ITEM #6(I). |