2022-04-14 13:26:2704/14/22 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. A SUB GAS PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 2. ON SHEET A-1, IT SHOWS A TANKLESS WATER HEATER; IS
 IT GAS OR ELECTRIC. WOULD YOU PLEASE CLARIFY PER THE
 WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 3. ON SHEET FD-1;
  
 A. DONE, BUT WITH A NEW COMMENT; THE SANITARY ISOMETRIC
 DIAGRAM IS HARD TO READ AS IT DOES NOT MATCH THE FLOOR
 PLAN. WOULD YOU PLEASE CORRECT TO MATCH PLANS PER THE
 WPB AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12)
 RESIDENTIAL PLUMBING?
  
 THE WASHING MACHINE IS NOT VENTED CORRECTLY PER THE
 2020 FBC SEC. P 3101.2 TRAP SEAL PROTECTION.
  
 THE LAV IN THE IS NOT VENTED CORRECTLY PER THE 2020 FBC
 SEC. P 3101.2 TRAP SEAL PROTECTION.
  
 THE ISOMETRIC DOES NOT MATCH THE LAYOUT OF THE PLUMBING
 FIXTURE. WOULD YOU PLEASE CORRECT PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 B. SECOND REQUEST; IT DOES NOT SHOW THE WASHING
 MACHINE, BAR, OR KITCHEN SINK. WOULD YOU PLEASE SHOW
 AND LABEL PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENT?
  
 C. DONE.
  
 D. SECOND REQUEST; WOULD YOU PLEASE SHOW THE SOURCE OF
 HOT AND PROVIDE AN ISOMERIC WATER DIAGRAM PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL
 PLUMBING.
  
 E. DONE.
  
 F. DONE.
  
 4. ON SHEET A-1 AND ALL THAT APPLY, WOULD YOU PLEASE
 LABEL THE BATHROOMS. WOULD YOU PLEASE PROVIDE PER THE
 WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 5. FORM R405-2020 SAYS AN ELECTRICAL HEATER, BUT GAS IS
 SHOWN ON PLANS. WOULD YOU PLEASE CORRECT PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 6. ON SHEET M-1, THE PLANS SHOW A DIFFERENT LAYOUT IN
 THE MASTER AREA IN COMPARICINE TO E-1 AND FD-1. WOULD
 YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON
 REQUEST.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved