| Date |
Text |
| 2022-04-12 09:59:23 | PLAN REVIEW BUILDING |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | BU1635 BN4338 |
| | ASFPM CFM US-21-11935 |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | NFPA 70 2017 EDITION NEC 2017 |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | SOW: REMOVE GARAGE DOOR (OHD) AND IN-FILL OPENING. |
| | INSTALL A NEW PEDESTRIAN DOOR AT WEST ELEVATION. |
| | |
| | 1. CITY OF WPB CHPT. 1 VALUE |
| | 109.3 BUILDING PERMIT VALUATIONS. |
| | |
| | 1A. THE STATED VALUE APPEARS LOW FOR THE PROPOSED SCOPE |
| | OF WORK. |
| | 1B. THE PERMIT VALUATION AND PERMIT FEE MUST BE |
| | COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED |
| | CONTRACTOR WOULD PROVIDE. THIS INCLUDES ALL LABOR, |
| | MATERIALS AND RENTALS OF EQUIPMENT TO PERFORM THE SCOPE |
| | OF WORK. |
| | 1C. YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY |
| | THE OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT |
| | RENTAL TO VERIFY VALUE. |
| | BASED ON THE INFORMATION PROVIDED, VALUE CANNOT BE |
| | DETERMINED AT THIS TIME. |
| | PLEASE INCREASE THE VALUATION ACCORDINGLY. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL |
| | |
| | 2. PROVIDE A SITE PLAN.... |
| | 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED |
| | WITH THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY |
| | A SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF |
| | NEW CONSTRUCTION AND EXISTING STRUCTURES ON THE |
| | SITE,... AND IT SHALL BE DRAWN IN ACCORDANCE WITH AN |
| | ACCURATE AND INCLUDED BOUNDARY LINE SURVEY. |
| | LOCATE THE OHD TO BE REMOVED AND FILLED IN AND LOCTATE |
| | THE PROPOSED EXT DOOR TO BE INSTALLED. |
| | |
| | 3. IDENTIFY TYPE OF EXT. WALL AT BOTH LOCATIONS. |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | 4. PROVIDE FRAMING PLAN FOR NEW EXT. DOOR OPENING. |
| | INCLUDE DEMENSIONS. |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | NOTICE: YOU CANNOT INSTALL AN INTERIOR DOOR AT AN EXT. |
| | OPENING. |
| | EVERY STRUCTURE SUBJECT TO WIND LOADS SHALL BE DESIGNED |
| | PER FBC RES CHPT 3 SECTION R301 OR ASCE 7-16. |
| | |
| | 5.PROVIDE A COPY OF THE CURRENT FLORIDA PRODUCT |
| | APPROVAL OR MIAMI-DADE NOA, APPROVED UNDER THE 2020 |
| | FBC, FOR THE PROPOSED EXT. DOOR. |
| | FL PRODUCT APPROVALS SHALL INCLUDE THE COVER SHEETS, |
| | EVALUATION REPORT AND INSTALLATIONS INSTRUCTIONS. |
| | |
| | 6. PROVIDE AN ELEVATION VIEW OF THE PROPOSED EXT. |
| | STUCCO SYSTEM. |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | 7. FBC 107.2.1 ALL INFORMATION, DRAWINGS, |
| | SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE |
| | NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE |
| | DESIGN. (SEE ALSO SECTION 107.3.5), CHPT. 471, F.S. & |
| | 61G15 AND CHPT. 481, F.S. & 61G1. |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | |
| | |
| | |
| | |