| Plan Review Notes For Permit 22010231 |
| Permit Number |
22010231 |
|
| Review Stop |
R |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-07-29 16:46:58 | NO PRODUCT APPROVALS WERE SUBMITTED FOR THE ROOFING | | | MATERIALS. THESE CAN BE DEFERRED IF REQUESTED IN THE | | | CONSTRUCTION DOCUMENTS UNLESS REQUIRED BY THE HISTORIC | | | REVIEWER. FBC AMENDMENTS 107.3.4.1 DEFERRED SUBMITTALS. | | | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS | | | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE | | | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT | | | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A | | | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL | | | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE | | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION | | | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. | | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL | | | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING | | | OFFICIAL. | | | | | | |
|