| Date |
Text |
| 2022-07-29 17:31:49 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: BC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) NO PRODUCT APPROVALS WERE SUBMITTED. FBC 107.3.4 - |
| | PROVIDE PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE |
| | REGULATED BY FAC 61G20-3.001 PER FLORIDA STATUTE |
| | 553.842 (5) THAT HAVE BEEN REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD. PROVIDE COMPLETE |
| | PRODUCT APPROVALS WITH FL OR NOA NUMBERS INCLUDING |
| | INSTALLATION INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES |
| | FOR EACH OF THE DIFFERENT ROOFING MATERIALS, WINDOW |
| | (GLASS TYPES), STRUCTURAL MULLIONS AND EXTERIOR DOOR |
| | TYPES. THESE ITEMS CAN BE DEFERRED IF REQUESTED, |
| | HOWEVER, THE DOCUMENTS MUST BE SUBMITTED AND APPROVED |
| | BY THE BUILDING DEPARTMENT BEFORE THEY CAN BE |
| | INSTALLED. ONLY ONE SET IS REQUIRED TO BE UPLOADED FOR |
| | ELECTRONICALLY SUBMITTED DOCUMENTS. FBC AMENDMENTS |
| | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |
| | |
| | 2) REVISE THE NOTE ON THE ELEVATIONS FOR THE WALL |
| | COVERING THAT SPECIFIES 2 COATS OF STUCCO OVER THE |
| | PAPER BACK LATH ON THE 5/8" PLYWOOD. FBC-R 703.7.2 AND |
| | ASTM C926 REQUIRES 3 COATS OF EXTERIOR CEMENT PLASTER |
| | (STUCCO). |
| | |
| | 3) FBC-R 703.7.3 REQUIRES 2 LAYERS OF WATER-RESISTIVE |
| | BARRIER EQUIVALENT TO 2 LAYERS OF TYPE D PAPER APPLIED |
| | INDEPENDENTLY OF EACH OTHER BETWEEN THE WALL SHEATHING |
| | AND THE WIRE LATH/STUCCO. |
| | |
| | 4) SOME OF THE FASTENERS SPECIFIED IN THE NAILING |
| | SCHEDULE ON SHEET A502 ARE NOT CODE COMPLIANT AND |
| | CONFLICT WITH THE STRUCTURAL SPECIFICATIONS. PLEASE ADD |
| | A NOTE THAT STATES THE NAILING/FASTENERS SPECIFIED IN |
| | THE STRUCTURAL DRAWINGS TAKE PRECEDENCE OVER THE |
| | SCHEDULE ON A502. FBC 107.2.1 |
| | |
| | 5) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| | OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |