| Date |
Text |
| 2022-07-11 17:19:42 | THU 7/7/2022 9:28 AM JAMES C. PAINE, JR. ARCHITECT |
| | EMAIL TO APPROVE BUILDING REVIEW WITH PROVISO. |
| | |
| | BUILDING REVIEW APPROVED WITH PROVISO. |
| | (NOTE: PROVIDE INFORMATION FOR REVIEW PRIOR TO |
| | INSTALLATION/INSPECTIONS TO AVOID CONFLICTS/DELAYS): |
| | 1- DURING THE PERMITTING OF THIS STRUCTURE THREE |
| | DIFFERENT FLOOD ELEVATION CERTIFICATES WILL BE |
| | REQUIRED: |
| | A) CONSTRUCTION DRAWINGS. |
| | B) BUILDING UNDER CONSTRUCTION. |
| | C) FINISHED CONSTRUCTION. |
| | NOTE: |
| | NEED TO PROVIDE THE CONSTRUCTION DRAWINGS ELEVATION |
| | CERTIFICATE NOW FOR REVIEW. |
| | |
| | 2- DESCRIPTION AND USE OF EXISTING STRUCTURE SHOWN ON |
| | THE SOUTH EAST CORNER OF THE PROPOSED GARAGE IS NOT |
| | CLEAR. SURVEY, ARCHITECT'S SITE PLAN(DWG SP-1) AND |
| | STRUCTURAL PLANS CALLS IT "BATH HOUSE", WHILE ALL OTHER |
| | ARCHITECTURAL PLANS CALLS IT "STORAGE/SHED". REVISE AS |
| | REQUIRED TO MATCH IN ORDER TO AVOID CONFLICTS/DELAYS. |
| | |
| | 3- REVISE DESIGN PRESSURES ON SHEET S-0 AND SHEET SP-1 |
| | BASED ON EXPOSURE D, HEIGHT (28.5 FT), EDGE DISTANCE |
| | (5'-0")SPECIFIED ON PLANS. |
| | NOTE: SIZE OF GARAGE DOOR SPECIFIED ON PLAN IS NOT |
| | LISTED ON TABLE R301.2(4) FBC-RESIDENTIAL. ARCHITECT |
| | MAY USE THE DESIGN PRESSURES FOR 9X7 DOOR OR PROVIDE |
| | CALCULATIONS BASED ON THE ACTUAL SIZE OF SPECIFIED |
| | DOOR. |
| | |
| | 4- ENERGY CALCULATIONS: REVISE WINDOW OVERHANG |
| | SEPARATION TO MATCH PLANS. ALSO, CALCULATIONS ARE NOW |
| | MISSING THE FRENCH GLASS DOOR ON THE EAST ELEVATION. |
| | |
| | 5- DEFERRED PRODUCT APPROVALS(APPROVED BY ARCH. PRIOR |
| | TO SUBMITTAL): |
| | A)EXTERIOR DOORS. |
| | B)WINDOWS. |
| | C)DECORATIVE SHUTTERS AND SPECIFY FASTENING. |
| | D)ROOF TILE AND CLEARLY SPECIFY ROOF TILE FASTENING |
| | METHOD. |
| | E) ROOF TILE ADHESIVE (IF USED) AND CLEARLY SPECIFY |
| | PADDY SIZE. |
| | F)ROOF TILE HIP & RIDGE METAL SUPPORT TO BE USED. |
| | CLEARLY MARK WHICH ONE WILL BE USED. |
| | G) FLOOD VENTS. COORDINATE WITH ITEM #1 ABOVE. |
| | |
| | 6-DEFERRED SUBMITTAL (APPROVED BY ARCH. PRIOR TO |
| | SUBMITTAL: GUARDRAILS AND HANDRAILS. |
| | |
| | |
| | |
| | |