| 2022-06-30 14:33:20 | NFIP REVIEW: |
| | |
| | 1- THIS BUILDING IS GOING TO BE BUILT IN A AE FLOOD |
| | ZONE WITH THE BASE FLOOD BFE: 6 & 7 FEET BASED ON NAVD |
| | 1988. |
| | CITY OF WEST PALM BEACH ORDINANCE REQUIRES A TWO (2) |
| | FOOT FREE BOARD ABOVE THE BASE FLOOD ELEVATION (SEC. |
| | 18-284 CITY ORDINANCE NO. 4729-17). NEED TO SPECIFY THE |
| | PROPOSED FINISHED FLOOR ELEVATION IN ALL FLOOR PLANS |
| | BASED ON NAVD 1988. |
| | DURING THE PERMITTING OF THIS STRUCTURE THREE DIFFERENT |
| | FLOOD ELEVATION CERTIFICATES WILL BE REQUIRED (SEC. |
| | 107.3.5.1.1 CITY AMENDMENTS): |
| | A) CONSTRUCTION DRAWINGS. |
| | B) BUILDING UNDER CONSTRUCTION. |
| | C) FINISHED CONSTRUCTION. |
| | NOTE: |
| | NEED TO PROVIDE THE CONSTRUCTION DRAWINGS ELEVATION |
| | CERTIFICATE NOW FOR REVIEW. |
| | |
| | RESPONSE: |
| | ELEVATION CERTIFICATE SUBMITTED IS FOR THE MAIN |
| | RESIDENCE. NEED TO PROVIDE THE CONSTRUCTION DRAWINGS |
| | ELEVATION CERTIFICATE FOR THE PROPOSED BUILDING. |
| | NOTE: FLOOD VENTS ARE REQUIRED FOR GARAGE AND EXISTING |
| | STORAGE/SHED. REVISE PLANS AS REQUIRED. |
| | ALSO, CLARIFY IF USING ENGINEERED FLOOD VENTS OR |
| | NON-ENGINEERED FLOOD VENTS. IF USING ENGINEERED FLOOD |
| | VENTS, THEN PROVIDE PRODUCT APPROVAL (IT MAY BE |
| | DEFERRED) AND WRITE STATEMENT REQUIRED BY SEC. R322.2.2 |
| | FBC-RESIDENTIAL. |
| | IF USING NON-ENGINEERED VENTS, THEN NEED TO PROVIDE |
| | COMPLETE DETAILS/SPECIFICATIONS. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | |