| Date |
Text |
| 2022-01-19 14:41:05 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected] AND REQUEST |
| | THAT IT BE CONVERTED TO PROJECTDOX. |
| | |
| | 1. FBC B 107.3.4.1. SUBMITTED MIAMI-DADE COUNTY NOA |
| | NO.: 18-0509.17, MIAMI-DADE COUNTY NOA NO.: 16-1116.09, |
| | MIAMI-DADE COUNTY NOA NO.:18-0409.06, MIAMI-DADE COUNTY |
| | NOA NO.:17-0322.03 & FL5374-R6 SHALL BE SUBMITTED TO |
| | THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE |
| | CHARGE WHO SHALL REVIEW THEM AND FORWARD THEM TO THE |
| | BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND |
| | FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF THE |
| | BUILDING. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE |
| | INSTALLED UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN APPROVED BY THE BUILDING OFFICIAL. ALL APPLICABLE |
| | DETAILS AND ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON |
| | THE PRODUCT APPROVAL DRAWINGS. |
| | 2.FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE METAL TO BE USED. SECOND REQUEST. |
| | 3. PROVISO: PROVIDE A SIGN AND SEALED ENGINEER LETTER |
| | CERTIFYING THE EXISTING FLAT/LOW SLOPED AREAS WERE |
| | INSTALLED AND MEETS ALL 2020 FBC REQUIREMENTS FOR |
| | REROOFING; REQUIRED BEFORE ROOFING FINAL WILL BE |
| | ISSUED. |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |