| Date |
Text |
| 2023-05-02 14:26:06 | NFIP PLAN REVIEW |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | CITY ORDINANCE NO. 4658-16 AND NO. 4729-17 |
| | |
| | 2ND REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | 1. LINE A8 A), B) & C) CHANGE ENTRIES TO N/A PER EC |
| | INSTRUCTIONS. |
| | 2. LINE A9A) ENTER THE SF OF THE GARAGE. |
| | 3. LINE A9B) ENTER NUMBER OF FLOOD OPENINGS. |
| | 4.LINE A9C) ENTER TOTAL NET AREA OF ALL VENTS COMBINED. |
| | THIS SHALL BE PREPARED BY A DESIGN PROFESSIONAL PER |
| | FEMA TECHNICAL BULLITEN # 1 SECTION 9.3.5 (PG. 39). |
| | 5.LINE A9D) CHANGE ENGINEERED FLOOD OPENINS TO YES. |
| | 6. LINE B8 FLOOD ZONE IS AE |
| | 7. LINE C2B) ENTER ELEVATION OF 2ND FLOOR. |
| | 8. SECTION D COMMENTS CHANGE MACHINERY TO :EQUIPMENT |
| | AND LOCATION PER C2E): ,,, |
| | 9. NO PHOTOS ARE REQUIRED AT CONSTRUCTION DRAWING EC. |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | |
| | |
| | |