| Date |
Text |
| 2022-01-06 16:26:25 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE IS AN INDICATION OF AN ASSEMBLY SEATING AREA |
| | THAT WAS NOT INCLUDED WITH THE ORIGINAL PERMIT. |
| | |
| | THERE IS NO FIRE RATED SEPARATION BETWEEN THE |
| | OCCUPANCIES; ASSEMBLY/INDUSTRIAL. |
| | |
| | PER NFPA 101 CH 6 OCCUPACNY CLASSIFICATION. |
| | |
| | 6.1.14 MULTIPLE OCCUPANCIES. |
| | 6.1.14.1 GENERAL. |
| | 6.1.14.1.1 MULTIPLE OCCUPANCIES SHALL COMPLY WITH THE |
| | REQUIREMENTS OF |
| | 6.1.14.1 AND ONE OF THE FOLLOWING: |
| | (1) MIXED OCCUPANCIES ? 6.1.14.3 |
| | (2) SEPARATED OCCUPANCIES ? 6.1.14.4 |
| | |
| | 6.2 HAZARD OF CONTENTS |
| | 6.2.1 GENERAL. |
| | 6.2.1.1 FOR THE PURPOSE OF THIS CODE, THE HAZARD OF |
| | CONTENTS SHALL BE |
| | THE RELATIVE DANGER OF THE START AND SPREAD OF FIRE, |
| | THE DANGER OF SMOKE |
| | OR GASES GENERATED, AND THE DANGER OF EXPLOSION OR |
| | OTHER OCCURRENCE |
| | POTENTIALLY ENDANGERING THE LIVES AND SAFETY OF THE |
| | OCCUPANTS OF THE |
| | BUILDING OR STRUCTURE. |
| | |
| | 6.2.1.3* FOR THE PURPOSE OF THIS CODE, WHERE DIFFERENT |
| | DEGREES OF HAZARD |
| | OF CONTENTS EXIST IN DIFFERENT PARTS OF A BUILDING OR |
| | STRUCTURE, THE MOST |
| | HAZARDOUS SHALL GOVERN THE CLASSIFICATION, UNLESS |
| | HAZARDOUS AREAS ARE |
| | SEPARATED OR PROTECTED AS SPECIFIED IN SECTION 8.7 AND |
| | THE APPLICABLE |
| | SECTIONS OF CHAPTERS 11 THROUGH 43. |
| | |
| | 6.2.2 CLASSIFICATION OF HAZARD OF CONTENTS. |
| | 6.2.2.1* GENERAL. THE HAZARD OF CONTENTS OF ANY |
| | BUILDING OR STRUCTURE |
| | SHALL BE CLASSIFIED AS LOW, ORDINARY, OR HIGH IN |
| | ACCORDANCE WITH 6.2.2.2, |
| | 6.2.2.3, AND 6.2.2.4. |
| | |
| | INDUSTRIAL OCCUPANCIES EXPOSE OCCUPANTS TO A WIDE RANGE |
| | OF |
| | PROCESSES AND MATERIALS OF VARYING HAZARD. |
| | SPECIAL-PURPOSE |
| | INDUSTRIAL OCCUPANCIES, WHICH ARE CHARACTERIZED BY |
| | LARGE INSTALLATIONS |
| | OF EQUIPMENT THAT DOMINATE THE SPACE, ARE ADDRESSED |
| | SEPARATELY |
| | FROM GENERAL-PURPOSE INDUSTRIAL FACILITIES, WHICH HAVE |
| | HIGHER DENSITIES OF HUMAN OCCUPANCY. |
| | INDUSTRIAL OCCUPANCY BUILDINGS, ALONG WITH STORAGE |
| | OCCUPANCY |
| | BUILDINGS, ARE MORE LIKELY THAN ANY OTHER OCCUPANCY TO |
| | HAVE CONTENTS WITH A WIDE RANGE OF HAZARDS. WHERE |
| | INDUSTRIAL |
| | OPERATIONS IN A SPECIAL-PURPOSE INDUSTRIAL OCCUPANCY OR |
| | GENERAL-PURPOSE INDUSTRIAL OCCUPANCY INCLUDE HIGH |
| | HAZARD |
| | MATERIALS, PROCESSES, OR CONTENTS (SEE 6.2.2.4), THE |
| | OCCUPANCY IS |
| | TO BE CLASSIFIED AS A HIGH HAZARD INDUSTRIAL OCCUPANCY, |
| | NOT AS A |
| | SPECIAL-PURPOSE OR GENERAL-PURPOSE INDUSTRIAL |
| | OCCUPANCY. |
| | DEPENDING ON ITS CHARACTERISTICS, A LABORATORY CAN BE |
| | CLASSIFIED |
| | AS A BUSINESS OCCUPANCY, INDUSTRIAL OCCUPANCY, OR OTHER |
| | OCCUPANCY. |
| | |
| | DUE TO THE NATURE OF THE INDUSTRIAL OCCUPANCY THE |
| | ASSEMBLY SPACE IS REQUIRED TO BE SEPARATED FROM THE |
| | INDUSTRIAL SPACE BY A 2 HOUR FIRE RATED SEPARATION OR 1 |
| | HOUR WITH COMPLETE FIRE SPRINKLER COVERAGE. |
| | |
| | |
| | |
| | 2) A REVIEW OF THE DOOR SCHEDULE IS REQUIRED TO ENSURE |
| | THAT THE EXIT DOORS MEET THE MINIMUM REQUIRMENTS OF |
| | ASSEMBLY OCCUPANCY AND REQUIRED FIRE RATING. |
| | |
| | |
| | |
| | 3) A REVIEW OF THE FIRE ALARM SYSTEM IS REQUIRED TO |
| | ENSURE IT MEETS THE MINMUM REQUIREMENTS FOR ASSEMBLY |
| | OCCUPANCY NOTIFICATION. |
| | |
| | |
| | |
| | 4) THE REVISED OCCUPANCY LOAD APPEARS TO BE TOO LOW FOR |
| | THE PROPOSED ASSEMBLY/SEATING AREAS. |
| | |
| | THE REVISED OCCUPANCY LOAD CALCULATIONS COULD NOT BE |
| | VERIFIED AS ACTUAL DIMENSION ARE NOT PROVIDED. |
| | |
| | PLEASE PROVIDE A DETAILED REVIEW OF THE PROPOSED |
| | ASSEMBLY SPACE/SEATING AREA. |
| | |
| | |
| | 5) THERE IS AN INDICATION OF A LOW WALL AT THE UPPER |
| | LEVEL. |
| | |
| | THOUGH THIS INDICATION WAS ON THE ORIGINAL PLAN |
| | SUBMITTAL, AS THIS NEW ASSEMBLY SPACE HAS BEEN PROPOSED |
| | WHAT IS THE PURPOSE OF THE UPPER LEVEL. |
| | |
| | PLEASE PROVIDE A DETAILED REVIEW OF THE INTENDED USE, |
| | IF ANY, OF THE UPPER LEVEL AND THE RELATIONSHIP IT HAS |
| | WITH THE NEW ASSEMBLY SPACE. |
| | |
| | |
| | 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |