| 2022-01-08 09:06:48 | ROOFING PLAN REVIEW |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | 2017 NEC |
| | |
| | 2ND REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | SOW: ROOFING-RECOVER |
| | FBC RES R908: EXISTING ROOFING |
| | R908.1.1 |
| | NOT MORE THAN 25 PERCENT OF THE TOTAL ROOF AREA OR ROOF |
| | SECTION OF ANY EXISTING BUILDING OR STRUCTURE SHALL BE |
| | REPAIRED, REPLACED OR RECOVERED IN ANY 12-MONTH PERIOD |
| | UNLESS THE ENTIRE EXISTING ROOFING SYSTEM OR ROOF |
| | SECTION IS REPLACED TO CONFORM TO THE REQUIREMENTS OF |
| | THIS CODE. |
| | |
| | NOTICE: STRUCTURE HAS A GABLE ROOF. THIS IS CONSIDERED |
| | ONE ROOF SECTION. ROOF PLAN SUBMITTED FOR REVIEW |
| | INDICATES ONLY ONE HALF OF ROOF SECTION TO RECEIVE NEW |
| | ROOFING |
| | ROOF SECTION. A SEPARATION OR DIVISION OF A ROOF AREA |
| | BY EXISTING EXPANSION JOINTS, PARAPET WALLS, FLASHING |
| | (EXCLUDING VALLEY), DIFFERENCE OF ELEVATION (EXCLUDING |
| | HIPS AND RIDGES), ROOF TYPE OR LEGAL DESCRIPTION; NOT |
| | INCLUDING THE ROOF AREA REQUIRED FOR A PROPER TIE-OFF |
| | WITH AN EXISTING SYSTEM. |
| | |
| | 1. SUBMIT A ROOF PLAN SHOWING THE ENTIRE ROOF SECTION |
| | TO RECEIVE NEW ROOFING. |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | 2. ADJUST VALUE OF WORK TO REFLECT ADDITIONAL WORK. |
| | CITY OF WPB CHPT109.3 BUILDING PERMIT VALUATIONS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL |
| | |
| | NOTICE: A PRE-INSPECTION BY A CITY BUILDING INSPECTOR |
| | IS REQUIRED. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | |