| Date |
Text |
| 2022-03-09 09:43:00 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) GENERATORS REQUIRE A SEPARATE PERMIT. A SEPARATE |
| | PERMIT APPLICATION AND CONSTRUCTION DOCUMENTS ARE |
| | REQUIRED FOR THE RESIDENTIAL GENERATOR. THE VALUE OF |
| | THE GENERATOR, GENERATOR PAD, TRANSFER SWITCH, WIRE, |
| | ETC. AND INSTALLATION COST IS REQUIRED TO BE DECLARED |
| | ON THE APPLICATION. FBC AMENDMENTS 105.1 AND 109 |
| | |
| | 2) THERE IS NO VALUE DECLARED FOR THE ADDITIONAL SCOPE |
| | OF WORK TO ADD THE CONCRETE SLAB AND THE OUTDOOR |
| | KITCHEN. BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF FBC 109.3 BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 3) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| | OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |