| 2022-07-25 12:12:43 | THIS PLAN WAS REVIEWED AND FAILED BY LT. BRIAN DOLAN, |
| | DIVISION OF FIRE PREVENTION, WITH THE FOLLOWING |
| | COMMENTS: |
| | |
| | - FIRE SPRINKLER PERMIT FROM 2013 IS NOT VALID FOR |
| | CURRENT CHANGE OF USE REQUEST. |
| | |
| | - SPRINKLER SYSTEM REQUIRES EVALUATION FOR OPERABILITY |
| | AND SUITABILITY FOR PROPOSED OCCUPANCY. |
| | |
| | - FIRE ALARM PERMIT FROM 2014 IS NOT VALID FOR CURRENT |
| | CHANGE OF USE REQUEST. |
| | |
| | - FIRE ALARM SYSTEM REQUIRES EVALUATION AND TESTING FOR |
| | OPERABILITY AND SUITABILITY FOR PROPOSED OCCUPANCY. |
| | |
| | - THE AREA SHOWN IN DRAWING DOES NOT ADDRESS AREA FOR |
| | PROPOSED OCCUPANCY AREA IN CHANGE OF USE PERMIT REQUEST |
| | |
| | - ANY AND ALL WORK ON THE FIRE SPRINKLER AND/OR FIRE |
| | ALARM SYSTEMS SHALL BE DONE UNDER SEPARATE PERMITS AND |
| | SHOP DRAWINGS BY CERTIFIED CONTRACTORS. |
| | |
| | - INSTALLATION OF "LOCKED BARRIERS" FROM STAIRWELLS AS |
| | PROPOSED REQUIRES REVIEW AND APPROVAL BY A FIRE |
| | PROTECTION ENGINEER FOR SUITABILITY/POTENTIAL BARRIER |
| | TO EGRESS OR INGRESS OF EMERGENCY PERSONNEL. |
| | |
| | PER EMAIL FROM FIRE MARSHAL CHIEF PETER LEDUC 15 JULY |
| | 2022: |
| | |
| | |
| | "SIR |
| | |
| | THANK YOU ONCE AGAIN FOR THE INFORMATION. |
| | |
| | YOU HAVE SUBMITTED INFORMATION FROM 2013-2015 AND I DO |
| | NOT SEE ANY INDICATION THAT THIS INFORMATION HAS BEEN |
| | REVIEWED/APPROVED BY A FPE MEETING THE CURRENT |
| | REQUIREMENTS OF AN EDUCATIONAL OCCUPANCY. |
| | |
| | RESPECTFULLY SUBMITTED. |
| | |
| | |
| | PETER LEDUC |
| | DIVISION CHIEF/FIRE MARSHAL |
| | WEST PALM BEACH FIRE DEPARTMENT" |
| | |
| | |
| | LT. BRIAN DOLAN |
| | DIVISION OF FIRE PREVENTION |
| | 561-804-4752 |
| | [email protected] |
| | |
| | |