| Date |
Text |
| 2021-12-30 09:13:12 | NEW COMMERCIAL BUILDING |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE HOURLY FIRE RATING FOR THE EXTERIOR |
| | WALLS THAT ARE 5 FEET FROM THE PROPERTY LINES - FBC |
| | TABLE 602 |
| | |
| | 2) PLEASE SHOW THE RESTROOM AND MOP SINK AREA WALL |
| | FINISHES TO COMPLY WITH FBC 1210.2.2 WALLS AND |
| | PARTITIONS. |
| | WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) OF SERVICE |
| | SINKS, URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH, |
| | HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS |
| | THAN 4 FEET (1219 MM) ABOVE THE FLOOR, (DRYWALL IS NOT |
| | CONSIDERED A HARD SURFACE) |
| | |
| | 3) FINISH SCHEDULE SHOWS WOOD BASE BOARD IN THE |
| | RESTROOM - SHOULD BE A NONABSORBENT MATERIAL - FBC |
| | 1210.2.1 FLOORS AND WALL BASES. |
| | IN OTHER THAN DWELLING UNITS, TOILET, BATHING AND |
| | SHOWER ROOM FLOOR FINISH MATERIALS SHALL HAVE A SMOOTH, |
| | HARD, NONABSORBENT SURFACE. THE INTERSECTIONS OF SUCH |
| | FLOORS WITH WALLS SHALL HAVE A SMOOTH, HARD, |
| | NONABSORBENT VERTICAL BASE THAT EXTENDS UPWARD ONTO THE |
| | WALLS NOT LESS THAN 4 INCHES (102 MM). |
| | |
| | 4) PLEASE SHOW THE STAIR HANDRAIL EXTENSIONS - |
| | HORIZONTAL AT TOP AND SLOPE AT BOTTOM PER FBC 1014.6 |
| | HANDRAIL EXTENSIONS. |
| | HANDRAILS SHALL RETURN TO A WALL, GUARD OR THE WALKING |
| | SURFACE OR SHALL BE CONTINUOUS TO THE HANDRAIL OF AN |
| | ADJACENT FLIGHT OF STAIRS OR RAMP RUN. WHERE HANDRAILS |
| | ARE NOT CONTINUOUS BETWEEN FLIGHTS, THE HANDRAILS SHALL |
| | EXTEND HORIZONTALLY NOT LESS THAN 12 INCHES (305 MM) |
| | BEYOND THE TOP RISER AND CONTINUE TO SLOPE FOR THE |
| | DEPTH OF ONE TREAD BEYOND THE BOTTOM RISER. |
| | |
| | 5) PLEASE SHOW THE TYPE OF TERMITE PROTECTION PER FBC |
| | 1816 |
| | |
| | 6) ACCESSIBLE RESTROOM - PLEASE SHOW THE MIRROR |
| | DIMENSIONS FROM THE FINISHED FLOOR TO THE "REFLECTIVE |
| | SURFACE" PER FBC A 603.3 MIRRORS. |
| | MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL |
| | BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING |
| | SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH |
| | FLOOR OR GROUND. |
| | |
| | 7) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE EXTERIOR DOORS, EXTERIOR |
| | WINDOWS AND ROOFING SYSTEMS - ALL PRODUCT APPROVALS |
| | NEED TO BE REVIEWED AND MARKED APPROVED BY THE BUILDING |
| | DESIGNER OF RECORD IF NOT LISTED BY THE PRODUCT |
| | APPROVAL NUMBER ON THE DRAWINGS. FBC WPB 107.3.4 |
| | |
| | 8) SEPARATE PERMITS ARE REQUIRED FOR - DUMPSTER |
| | ENCLOSURE, PARKING LOT, SITE LIGHTING, EXISTING |
| | BUILDING DEMO - PLEASE ACKNOWLEDGE THIS. |
| | |
| | 9) ITEMS SUCH AS ROOFING SYSTEMS, WINDOW AND DOOR |
| | PRODUCT APPROVALS, CANOPY DETAILS ETC. MAY BE DEFERRED |
| | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| | CONSTRUCTION DOCUMENTS - FBC WPB 107.3.4.1 DEFERRED |
| | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |