| 2022-01-07 11:41:37 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE IS AN INDICATION OF VINYL FLOORING THROUGHOUT |
| | THE UNIT, BUT NO SPEC SHEET FOR THE ACTUAL PROPOSED |
| | VINYL FLOORING. |
| | |
| | VINYL FLOORING IS MANUFACTURED AROUND THE WORLD AND NOT |
| | ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS. |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE PRODUCT |
| | SPEC SHEETS OF THE PROPOSED FINISHED |
| | VINYL FLOORING INDICATING THE FIRE BEHAVIOR RATING. |
| | |
| | 2) THERE IS NO INDICATION OF A REQUIRED FLOORING |
| | UNDERLAYMENT. |
| | |
| | PLEASE PROVIDE THE UNDERLAYMENT SPECIFICATION SHEET. |
| | |
| | |
| | 3) THERE ARE INDICATIONS OF WALLS BEING REMOVED THAT |
| | MAY AFFECT THE REQUIRED FIRE SPRINKLER HEAD COVERAGE. |
| | |
| | A FIRE SPRINKLER CONTRACTOR IS REQUIRED TO REVIEW THE |
| | PROPOSED WORK TO ENSURE CODE COMPLIANT COVERAGE IS |
| | MAINTAINED. |
| | |
| | SHOULD NO WORK BE REQUIRED, A LETTER FROM THAT |
| | CONTRACTOR WILL BE REQUIRED TO BE SUBMITTED ON FINAL |
| | FIRE INSPECTIONS TO THE FIRE INSPECTOR. |
| | |
| | SHOULD MODIFICATION BE REQUIRED IT SHALL BE UNDER |
| | SEPARATE PERMIT AND SHOP DRAWINGS. |
| | |
| | PLEASE PROVIDE A NOTE OF ACKNOWLEDGMENT ON THE PLAN |
| | SHEET. |
| | |
| | |
| | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |