| 2022-03-07 09:30:19 | COMMERCIAL BUILDING ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) OF THE PRODUCT APPROVALS |
| | LISTED ON THE DRAWINGS FOR THE EXTERIOR WINDOWS, |
| | EXTERIOR DOORS, ROOFING SYSTEMS ETC. |
| | |
| | 2) DRAWING A-1.01 SHOULD SHOW THE SQUARE FOOTAGE FOR |
| | THE ENTIRE BUILDING - PLEASE SHOW ALL OCCUPANCY |
| | CLASSIFICATIONS WITHIN THE BUILDING - SHOULD BE A LIFE |
| | SAFETY PLAN FOR THE BUILDING AS A WHOLE. |
| | |
| | 3) ROOFING SYSTEMS AND WINDOW AND DOOR PRODUCT |
| | APPROVALS MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS |
| | TO BE DEFERRED ON THE CONSTRUCTION DOCUMENTS - |
| | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |