| Plan Review Notes For Permit 21110999 |
| Permit Number |
21110999 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-01-28 11:06:09 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE GENERATOR PAD CALCULATIONS ARE FOR A GENERATOR | | | THAT WEIGHS 850 POUNDS. THE SPECIFICATIONS FOR THE 22KW | | | GENERAC GENERATOR HAS THE UNIT'S WEIGHT AS 466 POUNDS. | | | FBC AMENDMENTS 107.2.1 | | | | | | 2) THE VULT WIND SPEED IS 180 MPH ON THE PAD | | | CALCULATIONS AND 190 MPH ON THE PAD DRAWING. FBC | | | AMENDMENTS 107.2.1 | | | | | | 3) THE DESIGN NOTES ON THE DRAWING HAS THE 2021 FBC. | | | THE CORRECT CODE EDITION IS THE 2020 FBC. IT APPEARS | | | THAT THIS MAY HAVE BEEN ALTERED BY SOMEONE OTHER THAN | | | THE ENGINEER. | | | |
|