Plan Review Notes
Plan Review Notes For Permit 21110999
Permit Number 21110999
Review Stop B
Sequence Number 1
Notes
Date Text
2022-01-28 11:06:09PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE GENERATOR PAD CALCULATIONS ARE FOR A GENERATOR
 THAT WEIGHS 850 POUNDS. THE SPECIFICATIONS FOR THE 22KW
 GENERAC GENERATOR HAS THE UNIT'S WEIGHT AS 466 POUNDS.
 FBC AMENDMENTS 107.2.1
  
 2) THE VULT WIND SPEED IS 180 MPH ON THE PAD
 CALCULATIONS AND 190 MPH ON THE PAD DRAWING. FBC
 AMENDMENTS 107.2.1
  
 3) THE DESIGN NOTES ON THE DRAWING HAS THE 2021 FBC.
 THE CORRECT CODE EDITION IS THE 2020 FBC. IT APPEARS
 THAT THIS MAY HAVE BEEN ALTERED BY SOMEONE OTHER THAN
 THE ENGINEER.
  