| Date |
Text |
| 2022-06-22 08:13:44 | ADDITION AND ALTERATION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) ROOFING PRODUCT APPROVAL (18-0919.07) SHOWS THE |
| | MAXIMUM WIND DESIGN PRESSURE OF (-52) - SEE GENERAL |
| | LIMITATION NUMBER 7 ON THE PRODUCT APPROVAL - PLEASE |
| | PROVIDE SIGNED AND SEALED ADDITIONAL ATTACHMENT DETAILS |
| | FROM A DESIGN PROFESSIONAL FOR THE ROOFING WIND ZONES |
| | WHICH REQUIRE A HIGHER WIND DESIGN PRESSURE PER DRAWING |
| | S1. |
| | |
| | 2) ROOFING PRODUCT APPROVAL (22-0107.2) PLEASE CIRCLE |
| | THE ROOF SYSTEM TO BE USED IN THE PRODUCT APPROVAL - |
| | SEE GENERAL LIMITATION NUMBER 7 ON THE PRODUCT APPROVAL |
| | - PLEASE PROVIDE SIGNED AND SEALED ADDITIONAL |
| | ATTACHMENT DETAILS FROM A DESIGN PROFESSIONAL FOR THE |
| | ROOFING WIND ZONES WHICH REQUIRE A HIGHER WIND DESIGN |
| | PRESSURE PER DRAWING S1. |
| | |
| | 3) (THE 18" SHOWN ON THE DRAWING IS FROM THE HINGE SIDE |
| | - NEEDS TO BE FROM THE LATCH SIDE) ACCESSIBLE RESTROOM |
| | - PLEASE SHOW THE DOOR MANEUVERING CLEARANCE FROM |
| | INSIDE THE REST ROOM (18" BESIDE THE LATCH SIDE) TO |
| | EXIT THE RESTROOM. |
| | |
| | 4) ROOFING SYSTEMS MAY BE DEFERRED SUBMITTALS BY |
| | LISTING ITEMS TO BE DEFERRED ON THE CONSTRUCTION |
| | DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. FOR THE |
| | PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |