| 2022-06-23 10:37:55 | BATTERY STORAGE BUILDING |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED |
| | 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND |
| | SPEED OF 170MPH - PER FBC WPB SECTION 120. |
| | |
| | 2) PRODUCT APPROVAL (NOA 22-0216.05) FOR THE ROOFING |
| | SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP |
| | PANELS AS AN APPROVED SUBSTRATE. |
| | |
| | 3) PLEASE PROVIDE DETAILS FOR THE FOUNDATION SLAB FROM |
| | A DESIGN PROFESSIONAL - SHOW THE WIND DESIGN DATA USED |
| | ON THE SLAB DRAWINGS FBC 1603.1.4 |
| | |
| | 4) A BUILDING WITH A CONSTRUCTION TYPE OF VB REQUIRES A |
| | 1 HOUR FIRE RATED EXTERIOR WALL WHEN THE SET BACK FROM |
| | THE PROPERTY LINE IS 5' - PLEASE SEE FBC TABLE 602 |
| | |
| | 5) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION |
| | PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION |
| | REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION |
| | REQUIRED. |
| | A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL |
| | IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF |
| | HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED |
| | SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO |
| | SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION |
| | CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE |
| | METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT |
| | NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS |
| | AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE |
| | REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION |
| | AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON, |
| | FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL |
| | AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY. |
| | |
| | FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP |
| | H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING |
| | THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO |
| | AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF |
| | EVERY BUILDING AND STRUCTURE. |
| | |
| | |
| | |