| 2022-02-11 12:54:31 | NEW BUILDING (B) |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | |
| | 1) SURVEY SHOWS THE BUILDING IN A FLOOD ZONE - PLEASE |
| | PROVIDE AN ELEVATION CERTIFICATE FBC WPB 107.3.5.1.1 |
| | (1) |
| | |
| | 2) PLEASE PROVIDE THE REQUIRED DOCUMENTATION PER FBC |
| | 1612.5 FLOOD HAZARD DOCUMENTATION. |
| | |
| | THE FOLLOWING DOCUMENTATION SHALL BE PREPARED AND |
| | SEALED BY A REGISTERED DESIGN PROFESSIONAL AND |
| | SUBMITTED TO THE BUILDING OFFICIAL: |
| | |
| | 1.FOR CONSTRUCTION IN FLOOD HAZARD AREAS OTHER THAN |
| | COASTAL HIGH HAZARD AREAS OR COASTAL A ZONES: |
| | |
| | 1.2.FOR FULLY ENCLOSED AREAS BELOW THE DESIGN FLOOD |
| | ELEVATION WHERE PROVISIONS TO ALLOW FOR THE AUTOMATIC |
| | ENTRY AND EXIT OF FLOODWATERS DO NOT MEET THE MINIMUM |
| | REQUIREMENTS IN SECTION 2.7.2.1 OF ASCE 24, |
| | CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT |
| | THE DESIGN WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC |
| | FLOOD FORCES IN ACCORDANCE WITH SECTION 2.7.2.2 OF ASCE |
| | 24. |
| | |
| | 1.3.FOR DRY FLOODPROOFED NONRESIDENTIAL BUILDINGS, |
| | CONSTRUCTION DOCUMENTS SHALL INCLUDE A STATEMENT THAT |
| | THE DRY FLOODPROOFING IS DESIGNED IN ACCORDANCE WITH |
| | ASCE 24. |
| | |
| | 3) PLEASE PROVIDE A FLOOD EMERGENCY PLAN PER FBC 1612.4 |
| | ASCE 24-14 - 6.2.3 (3) WHERE REMOVABLE SHIELDS ARE TO |
| | BE USED, A FLOOD EMERGENCY PLAN SHALL BE APPROVED BY |
| | THE AUTHORITY HAVING JURISDICTION |
| | AND SHALL SPECIFY, AT A MINIMUM, THE FOLLOWING |
| | INFORMATION: STORAGE LOCATIONS OF THE SHIELDS, THE |
| | METHOD OF INSTALLATION, CONDITIONS ACTIVATING |
| | INSTALLATION, MAINTENANCE OF SHIELDS AND ATTACHMENT |
| | DEVICES, PERIODIC PRACTICE OF INSTALLING SHIELDS, |
| | TESTING SUMP PUMPS AND OTHER DRAINAGE MEASURES, AND |
| | INSPECTING NECESSARY MATERIAL AND EQUIPMENT TO ACTIVATE |
| | OR IMPLEMENT FLOODPROOFING. THE FLOOD EMERGENCY |
| | PLAN SHALL BE POSTED PERMANENTLY IN AT LEAST TWO |