| Date |
Text |
| 2022-02-24 13:38:59 | BUILDING AUDIT FOR PERMIT #21110176 |
| | PRIVATE PROVIDER |
| | SEC. 553.791 F.S. |
| | |
| | NEW SINGLE FAMILY RESIDENCE |
| | CODE IN EFFECT: FBC-RESIDENTIAL,7TH EDITION, 2020. |
| | |
| | 1- ROOF SHEATHING NAILING SPACING SPECIFIED ON SHEET |
| | S-2 DOESN'T COMPLY WITH TABLE R803.2.3.1 |
| | FBC-RESIDENTIAL. REVISE AS REQUIRED. |
| | |
| | 2- GABLE END UPLIFT DIAGRAM SHOWN ON SHEET S-2 DOESN'T |
| | MATCH ROOF ZONES ZONES SPECIFIED ON FIGURE R301.2(7) |
| | FBC-RESIDENTIAL. REVISE AS REQUIRED. |
| | |
| | 3- PLANS DON'T PROVIDE SPECIFICATIONS SHOWING HOW |
| | COMPLYING WITH THE NEW 2020 CODE REQUIREMENT FOR |
| | ROOFING UNDERLAYMENT SEC. R905.1.1.1 FBC-RESIDENTIAL. |
| | NOTE: CLEARLY SPECIFY WHICH METHOD OF SEC. R905.1.1.1 |
| | FBC-RESIDENTIAL IS GOING TO BE USED. AND PROVIDE |
| | PRODUCT APPROVAL AS REQUIRED BY F.A.C. 61G20-3.001 |
| | |
| | 4-STUCCO SPECIFICATIONS ON THE TYPICAL GABLE END DETAIL |
| | AND WALL SECTIONS ON SHEET A-3 DON'T COMPLY WITH SEC. |
| | R703.7.3 FBC-RESIDENTIAL. NEED TO SPECIFY TWO WATER |
| | RESISTIVE BARRIERS WHEN STUCCO IS APPLIED TO WOOD. |
| | |
| | 5- WIND DESIGN INFORMATION ON SHEET A-1 IS NOT CLEAR. |
| | ULTIMATE WIND SPEED AND NOMINAL WIND SPEED UNDER WALL |
| | PRESSURES DON'T MATCH THE ULTIMATE WIND SPEED AND |
| | NOMINAL WIND SPEED UNDER WIND DESIGN BASIS SHOWN ON THE |
| | SAME SHEET. REVISE/CLARIFY AS REQUIRED. WHICH ONE IS |
| | THE CORRECT DESIGN CRITERIA FOR THIS HOUSE? SEC. |
| | R301.2.1 FBC-RESIDENTIAL. |
| | NOTE: REVISE WINDOWS/DOORS DESIGN PRESSURES ACCORDINGLY |
| | TO AVOID CONFLICTS/DELAYS. |
| | |
| | 6- ENERGY CALCULATIONS: |
| | A)ROOF TYPE SPECIFIED ON PAGE 2 DOESN'T MATCH PLANS. |
| | THIS IS A HIP ROOF. REVISE AS REQUIRED. REVISE AS |
| | REQUIRED. SEC. R101.5.1.1.2 FBC-RESIDENTIAL. |
| | |
| | B)DOOR INFORMATION SPECIFIED ON PAGE 3 DOESN'T MATCH |
| | PLANS AND PRODUCT APPROVALS. SEC. R101.5.1.1.2 |
| | FBC-ENERGY CONSERVATION. REVISE AS REQUIRED. THERE IS |
| | NOT INSULATED DOOR ON THE SOUTH SIDE. THIS IS A |
| | METAL/GLASS FRENCH DOOR. NOTE: GLAZING IN DOORS NEEDS |
| | TO BE INCLUDED IN THE WINDOW GLAZING AREA. SEE SEC. |
| | R405.5.3 FBC-ENERGY CONSERVATION. |
| | |
| | C)E) WINDOW OVERHANG DEPTH AND SEPARATION INFORMATION |
| | SHOWN ON PAGE 3 DOESN'T MATCH PLANS. SEC. R101.5.1.1.2 |
| | FBC-. ENERGY CONSERVATION. REVISE AS REQUIRED TO MATCH. |
| | |
| | D)WINDOW AREA SHOWN ON PAGE 3 DOESN'T MATCH PLANS. SEC. |
| | R101.5.1.1.2 FBC-. ENERGY CONSERVATION. REVISE AS |
| | REQUIRED TO MATCH. |
| | |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |