| 2022-03-01 17:25:59 | WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION |
| | SERVICES/ BUILDING DIVISION |
| | 2020 FBC- BUILDING PLAN REVIEW |
| | W. P. B. PERMIT:21101420 |
| | ADD: 2400 METROCENTRE BLVD. EAST |
| | CONT: QUEST CONTRACTING, LLC |
| | TEL: 561-691-9400 |
| | E-MAIL: [email protected] |
| | |
| | 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION |
| | |
| | 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW |
| | CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES |
| | SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA |
| | BUILDING CODE, BUILDING. |
| | |
| | 4TH REVIEW |
| | DATE: TUES. MARCH 01ST/ 2022 |
| | ACTION: PASSED |
| | |
| | 1) BUILDING PROVISO: SHEETS S1.1.2 & S4.0.1 AND OTHER |
| | SHEETS SHOW EITHER FIELD WELDING OR BOLTED CONNECTIONS. |
| | WELDED OR BOLTED CONNECTIONS. THIS BUILDING CONTAINS |
| | EITHER BOLTED AND OR WELDED CONNECTIONS. THE CONTRACTOR |
| | IS REQUIRED TO PROVIDE WELD PROCEDURE SPECIFICATIONS & |
| | WELDER OPERATOR PERFORMANCE QUALIFICATION RECORDS IN |
| | ACCORDANCE WITH THE REFERENCED STANDARDS AT TIME OF |
| | INSPECTION FOR FIELD WIELDING, ON THE JOB-SITE |
| | WIELDING. THIRD PARTY CERTIFICATION WILL BE REQUIRED. |
| | THE OWNER MAY JUST HIRE A 3RD PARTY ENGINEERING FIRM TO |
| | COMPLETE AND APPROVE THE FORMER INSPECTIONS. REPORTS |
| | SUBMITTED TO BUILDING INSPECTOR AT TIME OF FRAMING |
| | INSPECTION. |
| | 2020 FBC-B 2204.1 WELDING |
| | 1. WELD PROCEDURES SPECIFICATIONS |
| | 2. QUALIFICATIONS OF WELDING PERSONAL |
| | 2017 FBC-B 2204.2 BOLTING. |
| | IF FURTHER CLARIFICATION AND OR QUESTIONS IS REQUIRED, |
| | PLEASE CONTACT THE CHIEF BUILDING INSPECTOR KEN CONRAD |
| | AT 561-805-6666 OR ACTING CHIEF BUILDING INSPECTOR |
| | RICHARD BRUNELLE AT 561-805-6670. |
| | |
| | 2) BUILDING PROVISO: 107.3.4.2 DEFERRED SUBMITTALS. FOR |
| | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | |
| | JAMES A. WITMER BN, PX, SFP, CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | |
| | |
| | |